How to write the technical disclosure of scaffold engineering construction? Here’s a ready-made template!

Always keep consistent with the construction technical scheme, and meet the quality acceptance specifications and technical standards

.

Ensure that all personnel related to the project accept the disclosure and form corresponding records

.

Construction technology disclosure construction technology disclosure is a necessary measure to make the construction personnel have a more detailed understanding of the engineering characteristics, technical quality requirements, construction methods and measures and safety, so as to facilitate the scientific organization of construction and safe and civilized production

.

3

.

4

.

Conclusion the above is the content of the technical disclosure before the scaffold entering the construction site

.

It is hoped that the technical personnel and construction personnel will strictly follow the requirements of the technical disclosure to ensure the construction safety and quality

.

Use standardized technical terms, international measurement units and unified measurement units; ensure that the language is easy to understand, and assist with illustrations or models when necessary

.

Safety technical disclosure is quite necessary in construction, so how to do it well? Take the technical disclosure record of a project of Huasheng Tiancheng as an example to share the content of technical disclosure of beam and slab support frame

.

Highlight the guidance, pertinence, feasibility and operability, and put forward specific and detailed operation and control requirements

.

It provides customers with a package of solutions for formwork engineering

.

The construction technical disclosure is very important, and will eventually be included in the project completion data; it has a strong guiding significance for the actual operation of the project site, is the continuation and improvement of the construction scheme, and is also the last pass of the project quality pre control

.

The scale of coiled scaffold is expected to exceed 170 billion yuan in 2027! Implement the national strategy, Huasheng Tiancheng participate in the construction of China (Zhejiang) pilot free trade zone! Scaffolding erection, demolition, acceptance of the 24 criteria, please put away! See how Huasheng Tiancheng scaffold escorts the construction of Hunan Meiyijia project, and the National Health Commission advocates celebrating the new year on the spot! How to prevent epidemic in construction site? Zanhe is watching here.

.

With a good reputation of safety, efficiency and zero accident, it has completed hundreds of national large-scale projects and gained high praise and trust from partners

.

5

.

The technical disclosure records (in triplicate) shall be properly kept, one for the operation team, one for the documenter, and one for the Discloser to keep, as part of the completion technical documents

.

Beijing Huasheng Tiancheng, an integrated service provider of building formwork, integrates the production, scheme design, leasing and professional construction of turnbuckle scaffold

.

After reading the above record of technical disclosure before project construction, do you know how to write the safety technical disclosure? Finally, we also sort out the principles of safety technical disclosure for reference: 1

.

2

.