During the closed construction period, vehicles from malinying road to Longcheng street can bypass Longcheng South Street, malinying East Road and Longcheng street..
.
According to the needs of the main project construction of Longcheng Street East Station of Metro Line 1, the traffic organization of malinying Road (Longcheng Street Longcheng South Street) will be adjusted from 0:00 on January 24, 2021 to 24:00 on September 10, 2021, and the main road and ramp from malinying road to Longcheng Street will be closed for construction
.