your attention is the driving force of our company’s development
.
It is an enterprise focusing on R & D, production of building construction embedded, component-based, and is a key supporting enterprise in Changsha
.
In order to ensure the safety of steel pipe scaffold, table 3.2.1 of article 3.2.1 in gb51210-2016 stipulates that under the general condition of safety level II, the erection height of floor type steel pipe scaffold shall not exceed 40m, and the erection height of steel pipe scaffold with cantilever steel beam bearing frame at the bottom shall not exceed 20m, About every 18 meters, a cantilever steel beam bearing frame needs to be set up again
.
Disadvantages: 1) the layout of the steel beam protruding into the room is complex, which hinders the cleaning of indoor construction waste and the walking of construction personnel; 2) the steel beam passes through the wall, which is easy to damage the concrete beam and plate components, which is easy to cause water leakage of the floor; 3) before the steel beam is removed, it may also need to cut the U-shaped anchor ring on site, and after the removal, it also needs to repair holes and subsidize bricks, which increases the construction time
.
4: Embedded system 1) embedded parts: there are two types: 180mm long ones are used for embedded in the connection between cantilever beam and building structure; 150mm short ones are used for embedded in the connection between upper tie rod and lower strut and building structure
.
The bearing frame at the bottom of the cantilever double row steel pipe scaffold is the most popular indoor and outdoor anchorage of the traditional cantilever steel beam bearing frame, and the embedding of the upper fixed point of the cable is shown in the following figure: the traditional cantilever steel beam must pass through the external wall of the building, extend into the indoor and lay on the main structure floor, and then anchor on the floor panel and floor beam with three U-shaped embedded parts
.
Among them, the fastener type steel pipe scaffold is widely used in the construction field because of its superior performance
.
A variety of construction processes can be crossed, which effectively improves the construction efficiency and optimizes the construction process
.
In recent years, with the increasing height of the building, the structure is becoming more and more complex
.
The new cantilever beam side fully embedded installation and erection device of this project is an efficient construction technology system in the prefabricated construction technology under the key technology field of housing and urban construction technology development, and the I-steel used in the new cantilever beam of this project Compared with the traditional products, it reduces the length of extending through the wall into the room and anchoring on the floor beam and floor panel, reduces the weight by more than 56%, and saves a lot of steel
.
When the steel beam runs through the stairwell, I don’t know how many workers have experienced a “slap in the head” accident here
.
For the model of diagonal beam and diagonal beam used in each project, please refer to the “cantilever beam layout plan” of our company for each project
.
The fixed length extending into the room should not be less than 1.25 times of the outdoor cantilever section
.
Therefore, when installing the new cantilever frame, the construction is simple, light-weight operation, and does not affect the construction of other processes
.
According to the two-dimensional identification code, we pay attention to the project overview
.
The traditional cantilever steel beam demolition process has many disadvantages, sometimes it needs to be cut on site, which not only wastes materials, but also time and labor
.
Therefore, under normal circumstances, it is necessary to use steel beams of ≥ 3M and 4-5m at the corner
.
Note: after the lower support rod is installed and adjusted to the stress state, the “adjusting sleeve” should be wrapped with adhesive tape in time to prevent the concrete from sticking on it
.
In view of the shortcomings of the traditional cantilever steel beam bearing frame, after five years of research and development, test and operation accumulation, the new cantilever beam side fully embedded installation and erection device with all technical indicators and safety performance up to the standard is shown in the figure below: there is no cantilever plate outside the beam, the distance between the inner and outer poles is 300 mm, and the distance between the inner and outer poles is 83 mm
.
your attention is the driving force of our company’s development
.
The cantilever steel beam is 1.23m long (< 1.75m), and the "pull-up cantilever bearing frame" is adopted
.
Use 180mm long embedded parts (cantilever layer) and 150mm short embedded parts (upper layer of cantilever layer) and 150mm short embedded parts (lower layer of cantilever layer) to install screw: this process is equipped with special “temporary fixed screw”, which is used to ensure that the embedded parts will not deviate in the process of concrete pouring
.
For the construction site using “prefabricated building”, the new cantilever frame can provide an effective solution to the pain points on the cantilever layer
.
Hunan Zhengwei Construction Technology Co., Ltd
.
This new installation method can effectively ensure the construction quality, eliminate the hidden danger of water leakage, and the reuse rate of components is 95%
.
In order to meet the needs of the construction of the main structure and the decoration of the external wall, it is necessary to set up the external wall scaffold
.
For the construction site using aluminum formwork, because the beam of the new cantilever frame does not need to extend into the room, it is unnecessary to use wood formwork to effectively eliminate the phenomenon of formwork explosion
.
Hunan Zhengwei Construction Technology Co., Ltd
.
The outer side of the beam has 600mm convex window plate, the distance between the inner vertical pole and the outer wall is 900mm, and the distance between the inner and outer vertical poles is 630mm
.
The business division of the company is located on the 19th floor of WuJie international, Ningxiang City, Changsha City, Hunan Province, with 55 employees, including 10 research and development personnel
.
The cantilever steel beam is 1.63M long (< 1.75m), and the "pull-up cantilever bearing frame" is adopted
.
When the cantilever steel beam is more than 2.4m, it is erected by the way of “upper double pull cantilever bearing frame + additional diagonal support”
.
For the model of straight beam used in each project, please refer to our company’s “cantilever beam layout plan” for each project
.
is a high-tech enterprise with independent legal personality
.
At present, the group standard review of this technology (technical specification for structural external cantilever steel pipe scaffold) has passed
.
According to the two-dimensional code, we pay attention to the component composition of our three structure external cantilevered scaffold 1: cantilevered beam 16 # ordinary I-steel as the main part, welded base plate, triangle reinforcing plate, U-shaped pull-up part and lower support part
.
The company and Central South University carried out a number of industry university research cooperation projects, and has obtained a total of 13 patents, including 1 invention patent and 12 utility model patents
.
1) Straight line beam: it is installed on the cantilever beam with straight-line structure
.
Hunan Zhengwei Construction Technology Co., Ltd
.
No longer need to implement welding, cutting and other processes on site, effectively eliminating the fire hazards
.
Disadvantages: 1) a large amount of steel is put in at one time, and the weight is large; 2) a 3-5M I-beam needs to rely on the tower crane in the whole process of installation and removal, and there are many blind areas in the lifting process, which has a great potential safety hazard
.
The outer side of the beam has a convex window plate of > 600mm, the distance between the inner vertical pole and the outer wall is > 1020mm, and the distance between the inner and outer vertical poles is 630mm
.
After the traditional overhanging steel beam is removed, the wall holes need to be repaired, the wall bricks need to be repainted, and the external wall bricks need to be subsidized
.
3: The lower support rod is made of Ф 50 * 3.0 (Q235 material) seamless steel pipe as the main part and welded with Ф 34 * 5 (Q235 material) seamless pipe adjusting sleeve
.
2: The diagonal tie rod is composed of Φ 20, Q235 galvanized round steel tie rod (positive wire, reverse wire), closed adjustable blue and wire tooth protective sleeve
.
After concrete pouring and before removing the side formwork, it is necessary to twist out the exiting turnover accessories
.
2) Diagonal beam and diagonal beam: the cantilever beam installed in the external corner of the building structure, the length code has “left 30, right 30”, “left 30, right 70” and other models and specifications
.
When the fixing ring at the upper end of the cable is removed, it needs to be cut on site and cannot be recycled
.
Note: (1) when installing the embedded parts, it is necessary to ensure that the contact surface between the embedded parts and the formwork is seamless and close, so as to prevent the concrete slurry from penetrating into the pipe of the embedded parts during the concrete pouring and tamping; (2) after the installation of the embedded parts, it is strictly forbidden for the vibrator to directly contact with the embedded parts during the concrete pouring and tamping, so as to ensure that the embedded parts are not damaged or offset.
.
The material is Q235
.
The length is 1030, 1130, 1230, 1630 and other different models and specifications
.