The lintel formwork has been installed, and the cast-in-place lintel is ready
.
1
.
Friends who need to build houses in Henan Province can scan the QR code below to contact Shangpin housing construction yellow worker: 18537453329 scan the QR code to see more building cases and house types and learn more about construction Team work.
.
And the maintenance of concrete has a great impact on its quality
.
Sounds very complex operation, but the construction team has done it completely, accurate size, first-class quality! This is called professional! After the completion of the main body, the plastering work of the external wall began
.
The vibration time is about 15-20s
.
It’s difficult for the construction masters in the village to have ordinary skills
.
It can be said that the roof is difficult
.
But in the eyes of Mr
.
For most rural friends, building a house is difficult and hard
.
This is the benefit of the profession
.
Only when we make sure of the villa drawings can we go on to the next step
.
Zhou, the wall masonry is horizontal and vertical, the mortar is full, the upper and lower joints are staggered, and the joint is firm
.
Floor engineering is also the key
.
Instead of being in a dilemma here, he might as well give it to the professional construction team to build a house, which is easy and labor-saving
.
It started in August and ended in November
.
Of course, window lines, lines, EPS components are indispensable, the details can highlight the intention of the house
.
First, set out according to the drawing, set up full framing; then set up the side formwork, lay the inclined panel, and reinforce it
.
3
.
According to Mr
.
It’s hard to build a house in three months or a year, but I don’t like the house
.
A 400 × 300 ground beam is made at the bottom of No.1 foundation, and then bricklaying is carried out, and a 24 × 300 ring beam is made at the top, which is the double beam brick concrete foundation
.
Contact Shangpin housing construction: Shangpin housing construction was founded in 2015, specializing in the whole solution of rural villa civil engineering, garden and interior decoration
.
2
.
When removing the formwork, tiny cracks will appear along the wall! If we want to do it, we need to do double-layer, which is also considered from the perspective of safety
.
He is carefree and comfortable
.
The pressure can be imagined
.
Choose a detailed drawing to avoid detours in housing construction; hire a professional construction team to build housing, and don’t worry about technical problems
.
When using the plug-in vibrator, it should be inserted quickly and pulled out slowly
.
If there is a mistake in the construction, they have to rework
.
Building houses in rural areas, can not make do with, there is a detailed set of drawings and professional and responsible construction team is the key
.
After the priming, painting and leveling of the external wall, the villa had begun to take shape
.
In general, the maintenance is carried out within 8 ~ 12h after concrete pouring in the environment, and the maintenance time in rural areas is generally 7 ~ 14 days
.
There are two points that we must pay attention to in rural housing construction
.
Zhou’s house was completely contracted to the professional Henan construction team – [Shangpin house construction]
.
Whether the house is built well or not, the first vision is to see how the wall is built! In this house of Mr
.
After the completion of the main foundation backfill, it is the main construction steps
.
In some places, the floor reinforcement has only one layer of load-bearing reinforcement without negative moment reinforcement
.
Zhou’s point of view, he doesn’t know anything about architecture
.
Zhou today, his family’s house building has never been flawed
.
They can’t build the house they like
.
This is also what we have always stressed in our residential park
.
After a question, I learned that Mr
.
He never asked about the house building
.
The second floor construction is also in full swing
.
After the formwork is installed, double-layer two-way steel mesh is laid
.
A house with good drawings can’t do without good design
.
After the floor concrete is poured, it should be vibrated tightly
.
Take advantage of leisure time to clean up the backyard and transport construction waste to designated places
.
It took only four months to build the house so exquisitely
.
The first is the drawings, and the second is the construction team
.
It took 490000 workers and materials to work
.
At ordinary times, we can also learn more about building on the Internet, so that we can have a strong foundation when building, which can help us better supervise the work
.
For exterior decoration, according to the owner’s preference, the real stone paint is applied to the exterior wall to improve the texture
.
At present, the main construction service scope is rural areas in Henan Province
.