What information should be submitted for inspection in each process of housing construction

(attached inspection application form before) 1

.

Installation (Foundation) of grounding devices (with application form for inspection attached) 1

.

Record of water storage test for sanitary ware 4)

.

Foundation raft reinforcement (reinforcement processing, installation inspection batch, reinforcement welding inspection batch, concealed acceptance record, intermediate process handover.

.

Cast in place structure appearance and size deviation Inspection lot 3

.

Pipeline equipment cleaning record 3

.

Power on trial operation record of building lighting 2

.

Acceptance record of concealed works of building electrical 2

.

Detail structure concealed acceptance record 6 Decoration data: (attached with inspection application form) 2

.

Membrane waterproof layer 2

.

Release the excavation line (construction records of construction control network, with setting out drawing attached); 2

.

Concrete construction quality inspection lot 2

.

Acceptance record of building electrical concealed works 4

.

Concrete mix proportion water consumption and opening appraisal record provided by commercial concrete station Data 4

.

Roof insulation layer concealed acceptance record 2

.

Inspection lot acceptance record of wire, cable threading and trunking laying 2

.

1

.

Overview of unit project 2

.

Single operation record of electrical equipment 3

.

Commencement report 2

.

Acceptance record of laying inspection lot of wires, cable ducts and trunking 2

.

Reinforcement processing inspection lot 2

.

Masonry quality control construction record 3

.

Veneer brick pasting or water-based coating (concealed acceptance record) 7

.

Tightness test record of water supply pipeline 2

.

Acceptance record of building electrical concealed works 6) installation of ordinary lamps and lanterns (for each floor) (inspection application form attached before) 1

.

Cast in place concrete formwork installation and removal construction record 3

.

Broken pile head (no data); 5

.

Source: the copyright of the network belongs to the original author

.

Building electrical divisional works 1

.

Pile foundation engineering (data are provided by the subcontractor); 4

.

Earthwork 1) earthwork excavation (attached with application form for inspection before) 1

.

Layout Water division (attached inspection application form) 1

.

Acceptance record of building electrical concealed works 5) Conduit threading (for each floor) (inspection application form attached before) 1

.

Acceptance record of inspection lot for handover test of low voltage complete distribution cabinet 11

.

Preparation materials for commencement (attached with application form for commencement) 1

.

Earthwork backfill inspection lot 2

.

Constructional column masonry reinforcement and tie bar construction record 4

.

Positioning coordinates and elevation control Abstract of planning department 2

.

Inspection lot of leveling layer 3

.

Indoor heating system: (application for inspection attached) 1

.

Lightning protection downlead (for each floor) (with application form for inspection attached) 1

.

Installation of sanitary ware: (application for inspection attached) 1

.

Record of quality acceptance of inspection lot for installation of grounding devices 2

.

Quality acceptance record of inspection lot of indoor water drainage pipeline and fittings installation engineering 2

.

Process handover 4) concrete works (attached with application form for inspection) 1

.

Record of quality acceptance of inspection lot for installation of air termination Data processing procedures: 1

.

Quality acceptance record of inspection lot of indoor water supply pipeline and fittings installation engineering 2

.

Reinforcement installation inspection lot 3

.

Insulation resistance test of electrical line 2

.

Roof leveling layer concealed acceptance record 3

.

Acceptance record of building equipotential bonding inspection lot 2

.

Masonry quality control construction record 3

.

Formwork removal inspection lot 2

.

Brick masonry engineering inspection lot 2

.

8

.

Equipotential bonding (each layer is made) (application form for inspection is attached before) 1

.

Indoor water supply system: (attached inspection application form) 1

.

Concrete whole process construction record 6

.

Inspection lot acceptance record of installation of ordinary lamps and lanterns 7) installation of switch and socket (for each floor) (inspection application form attached before) 1

.

Laying of pipes (each layer is made) (application form for inspection is attached before) 1

.

7

.

infilled wall masonry (application form attached) 1

.

Quality acceptance record sheet of inspection lot for installation of indoor heating auxiliary equipment, radiator and metal radiant panel 3

.

Inspection lot of door and window installation engineering (aluminum alloy or plastic steel window is selected) 7

.

Note: retest shall be conducted for materials entering the site, and 1 m2 of materials shall be taken for inspection)

.

Strength tightness test record of heating system operation and commissioning valve and radiator before installation, summary sheet of pipe material and equipment factory certificate 5)

.

brick concrete structure masonry (application form attached) 1

.

Installation of air termination (roof) (application for inspection attached) 1

.

Foundation waterproofing (inspection record of waterproof coiled material construction) Inspection lot, detail structure inspection lot and concealed acceptance record

.

9

.

Power on trial operation quality acceptance record of building lighting 9) fabrication of cable head (for each floor) (attached with application form for inspection) 1

.

Cement concrete surface layer or brick surface layer 4

.

Decorative plastering (internal wall is made by layer and external wall is made by facade) 6

.

General plastering (internal wall is made by layer and external wall is made by facade) 5

.

Setting out measurement record of multi-storey and high-rise buildings 3

.

Network record of construction setting out 3 Construction setting out acceptance record cushion foundation and main body setting out (attached with setting out application form before) 1

.

Concealed engineering acceptance record B

.

Foundation setting out (multi-storey and high-rise setting out construction record, with setting out drawing attached)

.

Cast in situ concrete formwork installation and demolition construction record 3) reinforcement processing and installation (attached with application form for inspection) 1

.

Work sequence handover 2) formwork removal

.

Acceptance record of building electrical concealed works 3)

.

Concealed acceptance record of Pipeline Engineering (relative to concealed) 4

.

Handover test of low voltage complete distribution cabinet 2

.

Record of quality acceptance of inspection lot for installation of sanitary ware and water supply fittings 2

.

Concrete slump inspection record 5) masonry engineering A

.

Earthwork excavation (inspection lot of earthwork excavation construction); 3

.

Indoor drainage system: (attached inspection application form) 1

.

Foundation cushion (inspection lot of concrete construction, slump, intermediate process handover, concrete construction acceptance record, opening appraisal record); 6

.

Detail structure 3

.

Membrane waterproof layer concealed acceptance record 4

.

Concrete and pouring construction record 5

.

Foundation trench inspection record 3

.

Roof data: (application form attached before) 1

.

Concealed works acceptance record 4

.

Record of quality acceptance of inspection lot for laying of lightning protection downlead and grounding trunk line in power transformation and distribution room Record form (lightning protection down lead) 2

.

Foundation trench inspection record of engineering quality responsible unit 2

.

Construction setting out acceptance record 2

.

List of project management personnel, attached with management certificate 3

.

Earthwork Field test record 3

.

Record of quality acceptance of inspection lot for installation of sanitary ware drainage pipe 3

.

Earthwork backfill (attached with application form before) 1

.

Earthwork excavation inspection lot 2

.

Concealed works acceptance record 5

.

Concrete pouring application form 3

.

Quality acceptance of inspection lot for installation of indoor heating pipe and fittings Acceptance record sheet 2

.

Fabrication, wiring and line insulation test of cable head Record of quality acceptance of inspection lot 10) installation of complete distribution cabinet (each floor) (application for inspection attached) 1

.

Waterproofing works (application form attached before) 1

.

(attached inspection application form before) 1

.

Drainage pipe irrigation and drainage Record of water and ball passing test 3)

.

Layered backfill field test record 4: Foundation formwork, reinforcement, concrete and masonry engineering (divided into foundation and main body) 1) formwork installation

.

No load operation record of electrical equipment 4

.

Concealed works acceptance record 6)

.

Project positioning and setting out (attached with application form for setting out) 1

.

Rainwater pipeline installation (application form attached before inspection) rainwater pipeline Record of quality acceptance of inspection lot for installation of grounding devices and accessories 8

.

Application form for approval of construction organization design, attached with construction organization design 4

.

Inspection test of line socket and switch grounding 2 Record of quality acceptance of inspection lot for installation of socket and fan 8) power on operation of building lighting (for each floor) (attached with application form for inspection) 1

.

Infilled wall masonry construction Process inspection lot 2

.

Waterproof protective layer (same as table 5)

.

Formwork installation inspection lot 2

.