Water conservancy project construction quality evaluation form (example and filling instructions)

These unit works are the main buildings in this example

.

3

.

The chief supervision engineer shall sign and affix the official seal, and then submit it to the project legal person for assessment

.

When filling in the sample form, we must abide by the “basic rules for filling in the form”, and meet the following requirements: 1

.

For example, the design level of unit works No

.

1, 2, 3, 8, 11 and 13 in this example is level 2

.

5

.

The volume of concrete (including reinforced concrete) must be filled in for concrete works, the volume of filled stone must be filled in for earthwork works, and the volume of masonry must be filled in for masonry works

.

Main building unit project: main buildings refer to the buildings that will cause downstream disasters or seriously affect the project benefits after the accident

.

8

.

Construction site: fill in the specific place name of the hub project construction

.

6

.

Project legal person (construction unit): fill in the full name

.

(3) Levee engineering: levee engineering of grade 1, 2 and 3 levees

.

Commencement date: fill in the year (4 digits) and month when the main project starts

.

Source: water conservancy project management.

.

(2) Channel engineering: ① irrigation channel: important open channel with irrigation flow greater than 20m3 / s and important canal system structures with water flow greater than 20m3 / S (sluice, aqueduct, tunnel, inverted siphon, culvert, etc.); ② flood discharge channel: important drainage channel with water diversion flow greater than 50m3 / s and its water passing structures (sluice, culvert, etc.)

.

The legal representative of the project legal person shall sign and affix the official seal, and submit it to the quality supervision organization for approval The project manager or the person in charge of the project appointed by the quality supervision organization shall sign and affix the official seal

.

Design, construction, supervision and other units: fill in the name (full name) used when signing the contract with the project legal person

.

Completion date: fill in the year (4 digits) and month when all the contents specified in the approved design are completed

.

Project name: fill in according to the project name of the approved preliminary design report

.

(according to the order No

.

9

.

Main quantities: fill in 2-3 items with the largest and second largest quantities

.

(1) Water conservancy and hydropower project: ① barrage (including auxiliary dam with grade conforming to main building grade), including all kinds of earth rock dam, concrete dam and masonry dam; ② flood discharge project: spillway and spillway tunnel (emptying tunnel); ③ diversion tunnel and penstock project; ④ generator project: power house project; ⑤ Sluice Project: barrage, flood discharge gate, scouring gate and water intake gate (6) large and medium irrigation and drainage pumping stations

.

10

.

4

.

49 of the Ministry of water resources, the quality level approved by the quality supervision organization is adjusted to the audit quality level) 11

.

Once the accident happens, it will cause disaster to the downstream or seriously affect the project benefit

.

2

.

The project quality standard is qualified: the quality of the unit project is all qualified

.

Excellent: all the unit projects are qualified, of which more than 50% (Note: including 50%) are excellent, and all the main buildings are excellent

.

This form shall be filled in by the person in charge of the quality inspection organization of the supervision unit after the project has been completed and assessed according to the approved design

.

All unit projects of main buildings are called main building unit project or main unit project, and “△” is added in the column of unit project name in the evaluation form

.

7

.

According to sl252 standard for classification and flood of water conservancy and hydropower projects, the main building grades are as follows: engineering grade I, II, III, IV, V, the main building grade is below 12345

.

Project level: fill in the project level and main building level

.

Evaluation date: fill in the actual date of project quality grade evaluation

.

If the main building grades meet the requirements of sl252, the unit project is the main building unit project

.