Source: public resources trading center of Zhengzhou City notice of bidding for construction of five road projects including Xiangshan Road (Yingcai Street Longyuan Street) in Zhengzhou City 1
.
Bidding conditions the construction of five road projects including Xiangshan Road (Yingcai Street Longyuan Street) in Zhengzhou City has been approved by Zhengzhou development and Reform Commission in the form of No.489 document [2019], No.449 document [2020], No Ji [2020] No
.
520, Zheng FA Gai de sign [2020] No
.
521 and Zheng FA Gai de sign [2020] No
.
725 approved the construction, the bid inviting party is Zhengzhou urban and Rural Development Bureau, the construction funds come from the financial funds, and the proportion of project investment is 100%
.
The project has met the bidding conditions, and now the public bidding is carried out for the construction of the project
.
2
.
Project overview and bidding scope 2.1 project name: Xiangshan Road (Yingcai Street Longyuan Street) and other 5 road projects in Zhengzhou; 2.2 project overview: 1) Xiangshan Road (Yingcai Street Longyuan Street) in Zhengzhou starts from Yingcai street in the north and ends at Longyuan street in the south, with a total length of 661.911 meters and an actual design length of 533.670 meters
.
The red line width of Yingcai Street Binhe section is 45m, and that of Binhe Road Longyuan Street section is 51m
.
The main construction contents include road, traffic, rainwater, sewage, lighting, greening and ancillary works, and the construction and installation cost is about 28.6082 million yuan; 2) Yutai Road (Yingbin Road Binhe Road) in Zhengzhou starts from the existing Yingbin Road in the north and ends at the planned Binhe Road in the south, with a total planning length of 1503.906 meters
.
After deducting the intersections of Yutai Road, JINDA Road, Keda street and Binhe Road which have been designed and implemented in other projects, the actual design length is 1403.651m and the red line width is 30m
.
The bidding section is Yutai Road (Tengfei road Binhe Road), pile No.: K0 + 685-k1 + 482.893, The actual construction length is 723.742 meters (except for 137.109 meters at the intersection of Yutai road and Tengfei street, JINDA Road, Keda street, Binhe Road)
.
The main construction contents include road, rainwater, sewage, traffic, lighting, greening and other projects, and the construction and installation cost is about 27 million yuan; 3) the road project of Biyun Road (Dingsheng Avenue Qunan Road) in Zhengzhou starts from Qunan road in the north and ends at Dingsheng Avenue in the south, with a total length of 1098.58 million yuan The actual design length is 1023.307 m, of which the length of railway unit is 80 M
.
The planning standard red line is 40 meters wide, and the width of the red line under the railway is 47-55.2 meters
.
Main construction contents: including road, protective culvert, rainwater, sewage, water supply, lighting, traffic, greening and ancillary works, the construction and installation cost is about 36.4218 million yuan; 4) the road project of Ditai Road (Qunan road Nanyun Road) in Zhengzhou starts from Qunan road in the north and ends at Nanyun road in the south, with a total length of 1237.071 meters
.
Excluding the intersection of Nanyun road and Qunan Road, the actual design length is 1156.32 meters, of which The length of railway unit is 106.641m
.
The standard red line width is 30 meters, and the red line width of Xingjia road Shuangtie section is 36 meters
.
Main construction contents: including road, protective culvert, rainwater, sewage, water supply, traffic, lighting, greening and ancillary works, the construction and installation cost is about 35.301 million yuan; 5) Yonghe Road (South Fourth Ring Qunan Road) road project in Zhengzhou (phase I project) starts from the auxiliary road of South Fourth Ring Road (Dashun Road) in the South and ends at Shuang railway in the north, with a total length of 1222.231 meters, the actual design length of 1112.901 meters and the actual design length of 1112.901 meters -The red line of Sheng’an road section is 40 meters wide, and the red line of Sheng’an road Shuangtie road section is 30 meters wide
.
The main construction contents include road, rainwater, sewage, traffic, lighting, greening, water supply and ancillary works, and the construction and installation cost is about 54.3742 million yuan; 2.3 bid section division: the project is divided into three bid sections
.
The first bid section: Xiangshan Road (Yingcai Street Longyuan Street) road project in Zhengzhou, Yutai Road (Yingbin Road Binhe Road) road project in Zhengzhou (K0 + 685-k1 + 482.893 section); the second bid section: Yonghe Road (South Fourth Ring Road Qunan Road) road project in Zhengzhou (phase I project); the third bid section: Biyun Road (Dingsheng Avenue Qunan Road) road project in Zhengzhou, Ditai road project in Zhengzhou( 2.4 scope of bidding: all contents included in construction drawings, bidding documents and bill of quantities (excluding railway part)
.
2.5 planned construction period: 365 calendar days
.
2.6 quality requirements: meet the current National latest specifications and standards, and reach the qualified project
.
Note: the bidder can bid for the above two bid sections, but only one bid section can be selected (if the same bidder ranks first in both bid sections, the bid section with large bid amount will win the bid)
.
3
.
Qualification requirements of the bidder: 3.1 registered in the people’s Republic of China, with independent legal person qualification and valid business license; 3.2 qualification requirements: the bidder must have the qualification of municipal public works construction general contracting grade I (including grade I) or above issued by the construction administrative department, and have valid safety production license; 3.3 the proposed project manager has the qualification of municipal public works First class registered Constructor Certificate, valid safety production assessment certificate, intermediate or above technical title, and no undertaking of construction in progress shall be issued; certificate of endowment insurance paid by the company for any six consecutive months since June 1, 2020 shall be provided (subject to the query list issued by local social security department and stamped with the seal of social security department or network query page, endowment insurance certificate shall be issued) The insurance certificate shall be the unit’s overall payment list or individual payment list; 3.4 the technical director to be assigned shall have the senior or above technical title of municipal related specialty, and have the labor contract relationship with the company; the endowment insurance certificate paid in the company for any six consecutive months since June 1, 2020 shall be provided (the inquiry list issued by the local social security department shall be stamped with the seal of the social security department) 3.5 performance requirements: since January 1, 2018, the bidder has undertaken a single contract amount of no less than 40 million yuan (including) for the construction of similar municipal roads; (the performance shall be subject to the contract signing date, and the bid winning notice, contract or agreement shall be provided at the same time) Financial requirements: the bidder shall provide the financial audit reports issued by the accounting firm or the audit department in the past three years (2017, 2018 and 2019), which are in good financial condition and are not in the state of being ordered to suspend business, being taken over, frozen or bankrupt (if the establishment year of the enterprise is less than three years, the actual establishment year of the enterprise shall prevail, and the audited financial report of the corresponding year shall be provided 3.7 reputation requirements: ① the bidder is not in the state of being ordered to suspend business, being disqualified from bidding or being taken over, frozen or bankrupt; there are no problems such as winning the bid or serious breach of contract, major project quality and production safety accidents, etc
.
in the recent three years; there are no problems such as being suspended from bidding by relevant departments and within the period of suspension (issuing commitment); ② it has passed the “credit China” ”Website( http://www.creditchina.gov.cn/ )”Credit service” – dishonest person to be executed “is used to query the enterprise, and” personal credit “- dishonest person to be executed list query” is used to query the legal representative and the proposed project manager, and the query webpage is provided
.
Those with dishonest records will be disqualified from bidding.
.