Taiyuan people pay attention! These sections are closed for construction!

On March 5, the traffic police detachment reported that the South extension project of Qianfeng South Road will be carried out from March 10 to June 30, and some roads will be closed at that time

.

Please make preparations for the detour in advance

.

After the construction starts, it is necessary to close the intersection of Yijing street, Qianfeng South Road, Xiyu East Street, Jinci Road, and 140m east of the intersection of Jinci road and Changxing South Street

.

During the construction period, all vehicles are not allowed to pass through the construction section

.

Vehicles can bypass Changfeng West Street, South Central Street, West Central Ring Road, xinjinci road and Nantun road

.

Taiyuan evening news reporter Zhang Jinfeng correspondent xiakun ramp closed construction, bus rerouting because xutan East Street to the East Central (North) ramp closed construction, now, through the ramp of 837 Road, 837 Road branch bus rerouting

.

According to the construction needs of the main project of the Academy of Agricultural Sciences station of Metro Line 1, the traffic organization of the auxiliary road on the east side of the overpass between East Central and xutan East Street will be adjusted from now on to June 5, and the ramp from xutan East Street to East Central (North) will be closed for construction

.

Affected by this, No

.

837 and No

.

837 branch buses passing through the ramp run along the original line to the West Longbao road of xutan East Street, then bypass the West Longbao Road, Xuefu East Street and Dongzhong ring road

.

Source: Taiyuan evening news.

.