Construction management is divided into three stages

Construction management work is divided into three stages: 1: construction preparation 2: construction stage 3: completion acceptance (1): construction preparation: 1: technical preparation, contract, project budget, construction organization design, drawing review

.

2: site preparation, three supplies and one leveling, project positioning, setting out and review, construction permit declaration, quality supervision declaration, temporary road occupation declaration, site civilized construction enclosure, temporary construction, materials, machines and tools mobilization

.

3: organize the preparation, organize the labor force to enter the site, (1): determine the construction and each working procedure, and the overlapping sequence

.

(2) Objective: to balance the flow of water by sections and make the operation plan (3); to organize the new workers to carry out safety education and assessment

.

(2) Construction stage: 1: quality control, construction organization design, system measures, supervision and implementation of specifications, procedures, process standards, quality acceptance standards, practical implementation of quality inspection and quality acceptance, process handover inspection and acceptance, concealed works inspection and acceptance, anti leakage water test inspection and acceptance, change of project visa, control of material quality Strengthen construction review and organize regular and irregular quality inspection of project quality

.

2

.

Safety control: implement the “prevention first” safety production policy, control five safety factors (people, materials, machinery, methods, environment), including: construction operation arrangement, power consumption and fire safety, implement hierarchical safety production responsibility system, implement safety production reward and punishment system measures, implement safety production inspection system, organize safety technical disclosure and safety management Education and learning

.

3: schedule control: according to the contract period and construction organization design, the construction schedule operation plan shall be prepared by stages, the schedule shall be checked in time, the plan shall be adjusted in time, and the cooperation between civil engineering and professional construction shall be coordinated

.

4: cost control, timely economic visa, continuous measures to reduce costs, optimize the schedule, optimize labor force, strictly control the quantity and quality of materials entering the site, implement quota material collection for material distribution, strengthen the review of construction setting out, control the quality in advance, reduce the loss of rework after the event, master the skills of economic claim, visa claim and reduce economic loss

.

5: civilized construction site capacity management 6: on site material management includes: production tools (do a good job in distribution and recycling), on-site materials (classified stacking and color marking on the construction layout), turnover materials (classified stacking)

.

(3) : completion acceptance stage 1: arrangement and compilation of technical data, including: Construction log, change project, construction acceptance and inspection record, material test report, quality inspection and acceptance record, data shall be recorded in time, signed in time, accumulated in time and sorted out in time

.

(the technical data are the basis for Party A to check and settle accounts, which can not be ignored)

.

2: check and check the completed project, organize the check and acceptance of the completed project, check the incomplete project left before the acceptance, and deal with it in time, so as to create conditions for the completion acceptance

.

3: project completion acceptance filing (Interim Measures for the administration of housing construction and municipal infrastructure project completion acceptance filing) provisions: the construction unit shall submit the following materials when handling the project completion acceptance filing: (1) project completion acceptance filing form (housing construction and municipal infrastructure project completion acceptance filing form) (2) project completion acceptance report (3) approval documents or permission documents issued by planning, public transportation fire protection, environmental protection and other departments according to laws and administrative regulations

.

(4) the project quality warranty signed by the construction unit; (5) other documents required by laws and regulations; (6) the “residential quality warranty” and “residential user’s Manual” shall also be submitted for commercial housing

.

4: acceptance of completed project ~ ~ recommended reading ~ ~ key points of road landscaping of municipal engineering, do you know the differences among joint review of construction drawings, design disclosure and technical disclosure, and how to choose the three connection methods of key points reinforcement, and which parts cannot be welded or bound? There are four principles for retaining positions of concrete structural walls, columns and large volume construction joints.

.