/ / official account official of WeChat / NOCITCE / WeChat changed the push rule because of the official account of WeChat
.
If you do not want to miss the highlight of this official account, please set the public address of the construction technology as the star sign and click “collect”, “look at” and “Zan” at the end of the text, so that each new article will appear in the subscription list at the first time
.
Star setting: enter the official account home page, click on the top right corner, click “set star”, and yellow star will appear next to the official account name (Android and iOS user operation is the same)
.
With a total length of 24 km, a 90 m super-high bridge deck and a two-way eight Lane Subsea Tunnel The Shenzhen China corridor under construction is another super sea crossing project after the Hong Kong Zhuhai Macao Bridge
.
It is estimated that after it is completed and opened to traffic in 2024, it will take only 20 minutes from Shenzhen to Zhongshan
.
Let’s have a look at the super project, which is known as “needle in the wind, embroidery on the sea floor”
.
How “bull” it is! Source: People’s network, Zhongshan network
.
The copyright belongs to the original author and the original source, if the original copyright owner does not agree
.