In the construction quality assurance system, the construction quality plan should be prepared according to ()

.

A

.

enterprise objective B

.

project quality objective C

.

enterprise quality manual D

.

project organization manual E

.

project cost plan “correct answer” BC “answer analysis” this question examines the content of construction quality assurance system

.

The project construction quality plan takes the specific project as the object, which connects the unified standard of construction quality acceptance, the general requirements of enterprise quality manual and procedure document with the specific project

.

It should be prepared according to the quality manual of the enterprise and the quality objectives of the project

.

The main contents of construction quality assurance system are as follows

.

A

.

project construction quality objectives B

.

project construction quality plan C

.

thought assurance system D

.

general quality control objectives of construction units E

.

organization assurance system “correct answer” abce “answer analysis” this question examines the contents of construction quality assurance system

.

Besides abce, construction quality assurance system also includes work assurance system

.

The main contents of the project construction quality work plan are as follows

.

A

.

specific description of project quality objectives B

.

inspection outline of important processes C

.

additional cost of quality assurance measures D

.

special cost of quality assessment E

.

correct answer of quality plan revision and improvement procedure Abe answer analysis this question examines the content of construction quality assurance system

.

The main contents of the construction quality work plan include: the specific description of the project quality objectives; the quantitative description of the responsibilities and authorities of each work link formed by the construction quality of the whole project; the specific procedures, methods and work instructions adopted; the test, inspection, verification and audit outline of important processes; the revision and improvement procedures of the quality plan; the implementation of the construction quality work plan; Other measures taken to achieve the quality objectives

.

Option CD is an external quality assurance cost

.

Among the following contents of construction quality assurance system of construction engineering, those belonging to organization assurance system are

.

A

.

technical training B

.

establishment of quality management group C

.

preparation of construction quality plan D

.

decomposition of construction quality objectives E

.

establishment of quality information system “correct answer” be “answer analysis” this question examines the contents of construction quality assurance system

.

The organization assurance system is mainly composed of establishing quality management group, perfecting various rules and regulations, clearly stipulating the tasks, responsibilities and authorities of the competent personnel of each functional department and the construction personnel involved in ensuring and improving the engineering quantity, and establishing the quality information system

.

Option a belongs to the work guarantee system

.

Option C belongs to the project construction quality plan

.

Option D belongs to the construction quality objective of the project

.

The operation of construction quality assurance system should focus on

.

A

.

process management b

.

plan management C

.

result management D

.

finished product protection “correct answer” a “answer analysis” this question examines the operation of the construction quality assurance system

.

The operation of the construction quality assurance system should take the quality plan as the main line, the process management as the center of gravity, according to the principle of PDCA cycle, and the steps of planning, implementation, inspection and treatment

.

6

.

In the PDCA cycle of construction quality assurance system, the work contents in the implementation stage include

.

A

.

determine the objectives of quality management b

.

check whether the planned action plan is strictly implemented C

.

disclosure of the planned action plan D

.

determine the policy of quality management E

.

carry out the construction operation technical activities according to the methods and requirements specified in the plan “correct answer” CE “answer analysis” this question examines the operation of the construction quality assurance system

.

Option ad belongs to the work that should be completed in the planning phase; option B belongs to the work that should be completed in the inspection phase

.

According to the quality management system basis and terminology, the principles of quality management are as follows

.

A

.

process method B

.

evidence-based decision-making C

.

active participation of all staff D

.

leadership E

.

focus on internal strength “correct answer” ABCD “answer analysis” this question examines the establishment and certification of quality management system in construction enterprises

.

“Quality management system basis and terminology” GB / T 19000-2016 puts forward seven principles of quality management, including (1) focusing on customers; (2) leadership; (3) full participation; (4) process method; (5) improvement; (6) evidence-based decision making; (7) relationship management

.

The quality management system documents of construction enterprises mainly include ()

.

A

.

quality manual B

.

quality certification document C

.

quality plan D

.

procedure document E

.

quality record “correct answer” ACDE “answer analysis” this question examines the composition of quality management system documents of construction enterprises

.

Option B belongs to the relevant documents of quality management system certification, but not the constituent content of quality management system documents of construction enterprises

.

9 [single choice question] the statement about quality management system certification and supervision is correct

.

Enterprise quality management system is certified by the national certification and accreditation supervision committee

.

C

.

the validity period of enterprise certification is six years

.

D

.

the enterprise is subject to the supervision and management of the certification agency in the third year after the certification

.

A

.

analysis of the answer

.

This question examines the quality management system of the enterprise Certification and supervision

.

Option B is wrong

.

The quality management system is evaluated independently, objectively, scientifically and fairly by a fair third-party certification body according to the requirements and standards of the quality management system

.

Option C error, the validity period of the enterprise’s approved certification is three years

.

If option a is correct and option D is wrong, the enterprise shall conduct regular internal audit to maintain the effectiveness of the quality management system, and accept the supervision and management of the enterprise quality management system implemented by the certification body once a year..

.