Assist in design optimization 2
.
Collision inspection before construction 3
.
Accurate calculation of planned cost 4
.
Deep foundation pit construction scheme simulation 5
.
Collision inspection between support maintenance structure and civil structure 6
.
Effective management of super high-rise material transportation 7
.
Collision inspection after main structure construction 8
.
Pipe line arrangement Comprehensive optimization of layout 9
.
Positioning of reserved holes in concrete wall 10
.
Positioning of reserved holes in steel structure 11
.
Comprehensive optimization of pipeline layout 12
.
Scheme optimization (4D visualization) 13
.
Quality and safety defect management 14
.
Virtual roaming 15
.
Component library of mechanical and electrical equipment 16
.
Equipment operation and maintenance data management 17
.
Collision between steel bar and steel structure 18
.
Net height inspection-
.