General contracting project of medical complex building project of Longgang District Hospital of traditional Chinese medicine (Lot 2) project daily report on July 30, 2021

The earthwork at the corner brace at the northeast corner of the second floor shall be excavated and transported out

.

4

.

A total of 63 people were vaccinated, including 40 management personnel, 39 completed vaccination, and the remaining one was not vaccinated due to physical reasons; There are 16 on-site construction personnel, and 16 have been inoculated; There are 8 logistics personnel in total, including 7 who have completed vaccination and 1 who has completed the first injection

.

Daily temperature measurement of personnel entering the site

.

2

.

Vaccination and nucleic acid testing

.

Earthwork excavation, stone breaking and outward transportation of the third layer

.

3

.

2

.

The project team of the works Department went to the site to inspect and guide the work

.

3、 Site construction and inspection 1

.

3

.

The earth and stone excavation on the south side of the second and third support room of the third layer shall be broken and transported out

.

Water level monitoring

.

4、 Subsequent construction plan 1

.

2

.

1、 Weather conditions II

.

After June 27, 64 people have been tested for nucleic acid, and all of them are negative

.

5

.

Daily pre shift education

.

Epidemic prevention material reserve

.

Epidemic prevention on site 1

.

Construction of corner brace at northeast corner of the second floor

.

5、 Matters to be coordinated by the owner none

. Lifting Anchor

          There are 64 managers and workers in the project department

.