There were workers under construction in a high-rise building
.
According to the design review and expert group’s argumentation opinions, according to the construction drawing design documents, construction contract and other relevant data and the currently completed parts, the buildings that need to be demolished are buildings above the ground of Building 1, building 2, building 5, building 10, building 19 and building 19A from a technical point of view, excluding the underground garage
.
According to the transfer announcement of Tianjin Land Trading Center, the land area of Tianfang yuemeijiang plot is 84673.1 square meters, including 80473.1 square meters of residential land and 4200 square meters of land for primary and secondary schools and kindergartens
.
In April 2018, a widely disseminated internal document showed that the concrete strength of individual buildings of Tianfang yuemeijiang project did not meet the design requirements
.
If the total residential construction area of 99100 square meters is calculated, the construction cost of the project is about 200 million yuan
.
Tianjin architectural design institute and architectural design and Research Institute of Tianjin University have carried out structural safety checking calculation for the constructed buildings 1-19, 19A and underground garage one by one, floor by floor, part by node, according to the rechecked concrete strength value and the calculation model of the original construction drawing design document
.
The project will be delivered in 2023
.
Throughout the event, when it entered the market in 2016, Yue Meijiang (also known as Yuecui Mingdi) once became the most eye-catching real estate in Tianjin Meijiang plate, but the quality problems revealed in 2018 plunged Yue Meijiang project into a vortex
.
This document triggered the subsequent demolition and reconstruction of yuemeijiang project
.
According to the reply of Tianjin Municipal People’s Government on Approving the quality accident investigation report of Yuecui Mingdi project (Jin Zheng Han [2019] No
.
SH), a listed company of Tianfang group, announced that Xiong Guangyu, chairman of the company, and Mao tie, general manager of the company resigned due to job changes
.
Project overview of the Ministry of housing and urban rural development on June 25, 2021 project location: Tianjin Meijiang plate project name: Yue Meijiang (also known as Yuecui Mingdi) construction unit: Tianjin Real Estate Group Co., Ltd
.
As the general contractor of construction, your company lent the enterprise qualification to a natural person and failed to fulfill the responsibility of enterprise quality management; The construction is not carried out in accordance with the relevant national construction specifications and standards for construction engineering quality, and there are problems such as random addition of water during concrete construction, inadequate maintenance and falsification of concrete strength inspection; The project quality control data is untrue and out of sync with the project progress; Failure to implement the stop work order issued by the competent construction administrative department leads to the loss of control of the quality management system of the construction unit
.
If all houses are sold at the price of 50000 yuan / m2, the total income of yuemeijiang project of Tianfang group is about 4.955 billion yuan
.
For the cost of demolition, an executive of a construction company told reporters that if the demolition subject is relatively complete, the construction company will generally pay the building owner because there are things that can be sold such as steel bars in the building
.
On the evening of August 31, 2018, the official website of Tianjin Municipal People’s government announced that di Da, chairman of Tianfang group, and Xiong Guangyu, general manager, were dismissed at the same time, and Wang Zhenyu, former deputy director of Tianjin SASAC, was appointed as the new chairman of Tianfang group
.
Source: the official website of the Ministry of housing and urban rural development, people’s daily, China business daily, etc
.
But for the construction situation like Yue Meijiang, he said that it still needs to be calculated according to the specific situation
.
In accordance with Article 61 of the regulations on the quality management of construction projects, our ministry has decided to give you an administrative penalty for reducing your grade I qualification of general contracting of construction projects to grade II qualification of general contracting of construction projects
.
The total aboveground construction area is 143800 square meters, of which the residential construction area is no more than 140800 square meters (including 41700 square meters of commercial and financial construction area)
.
Recently, a netizen left a message on the leadership message board asking how to stay
.
On June 30, he replied that “the main body of foreign houses and small high-rise buildings will be capped by the end of 2021, and the main body of high-rise buildings will be capped before August 2022, and the delivery will not exceed the end of June 2023 at the latest.
.
Finally, 18 residential buildings with completed main bodies were forced to be demolished and rebuilt
.
(Fangxin construction general) concrete supplier: concrete supplier of Tianjin Construction Engineering General Contracting Co., Ltd branch office Brief overview: the plot ratio of Tianfang yuemeijiang project is only 1.75, which is composed of 3 high-rise buildings with 24 ~ 29 floors, 3 small high-rise buildings with 11 floors, 12 foreign houses with 6 ~ 7 floors and 1 commercial apartment
.
40 to pursue responsibility for a major engineering quality accident, the concrete strength did not meet the standard, and many buildings were demolished and rebuilt, The Ministry of housing and urban rural development shall punish the general contractor for reducing the first-class qualification of general construction contracting to the second-class qualification of general construction contracting
.
The person in charge of Party A was sacked one after another
.
More than a month later, according to the Tianjin Municipal Commission for Discipline Inspection and supervision, di Da, Secretary of the Party committee and chairman of Tianfang group, was suspected of serious violation of discipline and law, and is currently undergoing disciplinary review and supervision investigation
.
Your unit signed for it on March 25, 2021 and did not submit a written statement (Defense) or application for hearing within the specified time
.
42), it is determined that the accident is a major project quality accident
.
on July 2, 2021, the Ministry of housing and urban rural development issued Jian Du FA Zi [2021] No
.
On January 7, 2019, according to the Tianjin Municipal Commission for Discipline Inspection and supervision, Zhang Bingzheng, former member of the Standing Committee of the Party committee and deputy general manager of Tianfang group, was suspected of serious violation of discipline and law, and is currently undergoing disciplinary review and supervision investigation
.
Jdfz [2021] No
.
(Tianfang group) construction unit: Tianjin Fangxin Construction Engineering General Contracting Co., Ltd
.
Many people in the construction industry told reporters that it is only the completion of the main body like Yue Meijiang, and the construction cost is about 2000 yuan / m2
.
It is reported that the concrete strength of the building should be C25, but C15 is used in construction
.
If you are not satisfied with the punishment decision, your unit may apply to the Ministry for administrative reconsideration within 60 days from the date of receiving the punishment decision or bring an administrative lawsuit to the people’s court within 6 months
.
After the outbreak of quality problems in yuemeijiang, the main person in charge of Tianfang group was sacked one after another, and Tianfang group began to enter the stage of power change
.
40 Tianjin Fangxin Construction Engineering General Contracting Co., Ltd.: on March 24, 2017, the municipal quality safety Corps under the former Tianjin Construction Commission found that the concrete strength of building 10 of Yuecui Mingdi project did not meet the design requirements during the random inspection of the resumption of construction projects supervised by Hexi District
.
In the special inspection activities carried out by Tianjin quality and safety supervision team in May 2017, yuemeijiang project ranked first among the projects with many quality and safety problems, and relevant units were criticized by the city
.
The document is required not to be made public, but it is posted on the relevant website
.
Yuemeijiang’s project has been basically completed before, which means that all the demolition will cost Tianfang group about 200 million yuan
.
It is now a long demolition and reconstruction work to welcome yuemeijiang, involving more than a dozen buildings of the project
.
As a result, the structural strength was insufficient, which was criticized by the housing and Urban Rural Development Commission
. Solid Lifting Socket Cross Pin
During the interview around yuemeijiang project, the reporter heard the sound of electric drills and the knocking sound of metal objects
.
Then, the maximum compensation for the owner is about 495 million yuan paid monthly for two years and five months (in the case of all choosing waiting rooms), and the minimum is all one-time compensation, totaling about 297 million yuan (in the case of all choosing to check out)
.
The Ministry of housing and urban rural development issued the notice on administrative punishment opinions of the Ministry of housing and urban rural development to your unit on March 11, 2021 (jianduzhengao Zi [2021] No
.
Or hundreds of millions of losses
.
10)
.
It is worth noting that the above estimated expenses do not include the compensation given by Tianfang group to the owner
.
10 days later, Tianfang development (600322
.