More than ten construction sites have been closed down! From now on, the project leaders of the construction / construction / supervision parties shall not leave the city and must be on duty full-time

If it is found that the epidemic prevention and control is not in place, it shall be ordered to rectify immediately; If the circumstances are serious, it shall be ordered to stop work for rectification and deal with it according to law and regulations

.

In this case, stop work immediately and block the construction site! Previously, many places issued notices on epidemic prevention at construction sites

.

For each project, the project leader of the construction unit shall be the team leader, and the project leader of the construction and supervision unit shall be the deputy team leader

.

Continue to promote the publicity and positive guidance of vaccination work on the construction site, improve the vaccination willingness of employees, and ensure that employees on the construction site “should receive as much as possible, and should receive as much as possible”

.

As of August 3, 11 construction sites have been sealed and controlled in Wuhan

.

Once an epidemic event is found on the construction site, the project department shall immediately report it level by level and deal with it decisively according to relevant regulations

.

In case of an outbreak, report to the local street and town, health, housing and construction departments at the first time, and deal with it in a timely manner according to the procedures, without delay, concealment or omission

.

Strictly control the entry of external personnel and vehicles into the construction site, and irrelevant personnel are strictly prohibited

.

Make emergency preparations for various outbreaks

.

The construction unit, supervision unit, construction general contractor and construction labor subcontractor shall strictly implement the main responsibility for epidemic prevention and control, further refine the epidemic prevention and control plan and emergency plan, and strictly control and comprehensively investigate key populations, key places and key areas

.

Units that fail to promote the vaccination work and the prevention and control work is not in place shall be ordered to make rectification within a time limit

.

The disinfection and health protection requirements of transport vehicles and relevant personnel shall be strictly implemented for the mobilization of materials and equipment

.

Recently, a number of emergency documents have been issued to strengthen the epidemic control on the construction site: Hefei: from now on, the project leaders of all construction, construction and supervision units must not leave fertilizer, and must be on duty, on duty and on duty full-time

.

The subsequent new construction personnel who have not been vaccinated shall be vaccinated within 2 days after mobilization

.

Anyone with fever, cough, chest tightness, shortness of breath, dyspnea and other symptoms shall be prohibited from entering the construction site, and shall be sent to a doctor immediately on the premise of personal protection

.

For more information, please check the history after paying attention

.

If there is no relevant certificate, they are strictly prohibited to enter

.

On August 3, there were 9 newly confirmed cases and 3 asymptomatic infections, all of which were isolated and closed management personnel at the same construction site in Wuhan

.

Wuhu: strictly implement the system of project manager and director on duty, 24-hour duty and daily safety production information submission On August 3, Hefei Municipal Bureau of housing and urban rural development issued the notice on doing a good job in epidemic prevention and control management in the field of construction

.

If you need to work on the construction site in our city, you need to provide the nucleic acid test certificate within 48 hours

.

To establish the entry and exit registration and body temperature detection system, special personnel must be responsible for measuring the temperature of the entrants

.

Measure the body temperature of all personnel on the construction site twice a day in the morning and evening

.

In accordance with the principle of “receiving as much as possible”, actively organize the construction personnel who meet the vaccination conditions on the construction site to be vaccinated in time and in batches, and realize the full vaccination of the construction personnel before August 15 (at least complete the first dose of vaccination)

.

Original link: http://zjw.wuhu.gov.cn/xwzx/tzgg/8291653.html On August 2, Suzhou Municipal Bureau of housing and urban rural development issued another epidemic prevention notice in the field of Construction: once the temperature at the construction site is found to be unqualified, the project leading group shall immediately start the emergency response plan

.

The personnel on the construction site shall not go out and leave the economy unless necessary, so as to reduce the flow of personnel

.

Guangdong: all new entrants to housing and municipal construction sites must hold the negative certificate of nucleic acid test within 48 hours, otherwise they are strictly prohibited from entering

.

If it is confirmed that there is a suspected or confirmed case, stop work immediately and block the construction site

.

Jinan: if yellow code and red code are found, they shall be isolated immediately, and medium and high-risk areas shall not be used to assist migrant workers

. Crown Foot Anchor

In case of yellow code and red code, the personnel shall be isolated immediately and reported quickly

.

If it is confirmed that there is a suspected or confirmed case, stop work immediately and block the construction site, and cooperate with the relevant local departments to carry out epidemic prevention and treatment

.

Promote vaccination

.

Bring the epidemic prevention and control work and vaccination into the scope of supervision and inspection, and check whether the vaccination of enterprises and construction sites should be “received”, and whether the epidemic prevention and control work is in place

.

On August 2, Wuhu Municipal Construction Management Office’s notice on Further Strengthening the epidemic prevention and control of construction sites proposed that the project manager and director should strictly implement the on-the-job shift, 24-hour duty and daily safety production information reporting system, and resolutely put an end to late reporting, omission, false reporting and concealment

.

In principle, temporary workers, casual workers and surprise workers are not used, and recent migrant workers are not used

.

From now on, the project leaders of all construction, construction and supervision units shall not leave fertilizer, and must be on duty, on duty and in a state of full-time

.

Strictly implement the real name system management of personnel entering and leaving the site, strengthen the daily health inspection of workers in the site, and measure the body temperature of all personnel entering the site

.

All parties involved in the construction of the project shall be equipped with sufficient disease control supplies such as masks, thermometers and disinfectants, and the reserve shall not be less than one week.

.

Anyone with fever, dry cough and other symptoms shall be prohibited from entering, and shall be reported and handled properly in time

.

Implement 14 day centralized isolation for construction participants from high-risk areas; The construction participants from medium risk areas shall be isolated at home for 14 days

.

According to the activity track, 7 people work at the construction site of China Construction Third Bureau near wanjiahu community

.

Mobile phone entrance registration personnel should register and compile data to check the key information such as ID number and mobile phone number

.

All new entrants to the housing and municipal construction site must hold the negative certificate of nucleic acid test within 48 hours

.

Sources: Hefei Municipal Bureau of housing and urban rural development, Guangdong Provincial Department of housing and urban rural development, Jinan Municipal Bureau of housing and urban rural development, the official website of the National Health Commission, Jimu news, local municipal housing and urban rural development departments, Nanjing Construction and other construction managers: on August 2, 7 migrant workers were found to be nucleic acid positive in Wuhan

.

Original link: http://zfcxjst.gd.gov.cn/xxgk/wjtz/content/post_ 3451044.html Jinan on August 3, Jinan Municipal Bureau of housing and urban rural development issued the emergency notice on doing a good job in the epidemic prevention and control of housing construction projects in the city, which made it clear that all personnel of the project should be surveyed and counted, focusing on the investigation and registration of residents in medium and high-risk areas in China within 14 days

.

Full text link: Jinan issued an emergency notice

.

Strict control measures shall be taken for new entrants, and medium and high-risk areas shall not be used to assist migrant workers

.

If the measures are not implemented in place or there are major potential risks, the relevant enterprises and responsible personnel will be seriously dealt with

.

Original link: http://cxjsj.hefei.gov.cn/zwgk/tzgg/18121845.html On August 3, Guangdong Provincial Department of housing and urban rural development issued the emergency notice on strictly preventing and controlling the epidemic situation on the construction site of housing and municipal engineering

.

If it is found that the implementation is not effective, it will be seriously held accountable

.

Units and projects that fail to implement prevention and control measures shall be seriously accountable

.

For those who have recently come from other places and have not been vaccinated without justified reasons, if they need to work on the construction site in our city, they shall provide the nucleic acid test certificate within 48 hours

.

The Municipal Construction Bureau will supervise the implementation of the two responsibilities for epidemic prevention and control in the way of “four no and two direct”

.

In case of suspected cases or confirmed cases confirmed by medical institutions, the project shall be stopped immediately, the construction site shall be blocked, and the disease control department shall be cooperated to carry out prevention and treatment

.

Key information should be informed of the local community in time

.

In cities and counties (districts) requiring full staff nucleic acid testing, all construction personnel must hold the test results from the date of local regulations, otherwise they shall not enter the construction site

.

All construction sites shall be open to only one entrance and exit

.