What principles must be observed in the construction of municipal comprehensive pipe network?

The key points of drawing review are as follows: 1

.

2

.

At the site, the elevation and line position shall be adjusted according to the actual situation of the site

.

6

.

If the power pipeline crosses the greening planting and structures, the municipal pipeline or the power bureau can be coordinated for adjustment

.

Reconstruction of 18 buildings, loss of more than 700 million! Ministry of housing and urban rural development: the construction unit is demoted! The person in charge of Party A fell off one after another

.

The cross arrangement sequence of less and convenient maintenance times and more and inconvenient maintenance times: 1   Various engineering pipelines shall not be overlapped and directly buried in the vertical direction   The water supply pipe shall be above the drainage pipe 3   Gas pipeline shall be above other pipelines (except thermal pipeline) 4   The power pipeline shall be under the thermal pipeline and above other pipelines 5   The heat pipe shall be above the combustible gas pipeline and water supply pipeline 6   The elevation of engineering pipelines at the intersection point shall be determined according to the elevation of drainage pipelines

.

The gas pipeline is required to have no structures within 1m in the vertical and horizontal directions, including sketches, Waterscape, permanent flower bowl and enclosure, and no arbors, grasses and large shrubs

.

Try to avoid power tube wells (chambers) for planting

.

Landscape design shall consider beautifying or weakening various exposed boxes that cannot be avoided

.

When the pipeline crosses, pay attention to the minimum vertical clear distance: key points of the review of the comprehensive pipe network: ➣ consider the distance between the fuel gas and other pipelines, especially when crossing, review whether the position of the pressure regulating station affects the normal use Considering the backfilling of gas pipeline ➣ whether the location of thermal heat exchange station is appropriate and check the elevation of pipeline at the intersection with other pipelines ➣ determine whether the location of water supply pump house and main pipeline can meet the normal use of the whole park, check the elevation of water supply pipeline at the intersection of water supply pipeline direction ➣ drainage check the elevation of pipeline and municipal main pipeline to see whether water can be discharged

.

If the green space between two buildings is on the garage roof, it must be combined with the municipal rainwater well between the buildings, and the seepage and drainage pipeline shall be added at the apron near the building, especially the residence with courtyard on the first floor to lead the rainwater to the municipal rainwater well; 10

.

It needs the joint efforts of designers and constructors to achieve perfection

.

Whether important nodes such as landscape structures, sketches and important entrances and exits avoid gas pressure regulating box and outdoor box type substation; 2

.

In principle, all professional pipelines shall not pass through the courtyard on the first floor, so as not to affect future maintenance, especially control the access shaft of the main pipeline into the courtyard; 4

.

Pipelines with similar properties and similar buried depth shall be arranged together as far as possible

.

Whether the location of large group green space avoids the area with dense pipelines; 3

.

Wonderful review of previous periods 1

.

The pipeline with shallow buried pipe gives way to the pipeline with deep buried pipe       3

.

2

.

Try to keep the water supply and drainage pipeline away from the waterscape, and there shall be no pipe well in the waterscape; 8

.

There shall be no structures and trees and shrubs planted vertically for tap water and fire pipelines, and ponds, balls and hedges can be planted

.

The buried depth of water supply and drainage pipelines must be strictly controlled

.

In the design stage of the garden project, it is necessary to closely combine the design scheme of the municipal comprehensive pipe network and the comprehensive pipe network diagram to conduct the combined drawing review, so as to ensure the normal realization of the landscape effect and the normal delivery of the municipal pipeline

.

The one with small construction quantity shall allow the one with large construction quantity

.

However, if the elevation of the pipeline entering and leaving the house has been confirmed and the buildings have been reserved, adjusting the horizontal and vertical position of the pipeline may increase the cost

.

Flexible material pipe gives way to rigid material pipe

.

The septic tank shall be located away from the main entrances and exits, squares and high terrain as far as possible, so as to reduce the impact of air pollution on residents; 11

.

Because the drainage pipeline is a non pressure pipe, the elevation of each municipal rainwater well must be understood before the design of the landscape drainage system to prevent rainwater from pouring back; 9

.

Source: the copyright of pipe gallery construction belongs to the original author

.

Comprehensive pipe network is an art, which needs to give consideration to all disciplines and check the elevation of each intersection

.

Pressure pipe gives way to gravity gravity flow pipeline; 2

.

Another major change in registration certificate! Cancel the requirements of major and working years, and the rolling cycle of achievements will change from 2 years to 4 years! 3

.

Power cable and telecommunication cable should be kept away from each other according to the principle that the power pipeline is on the east or south side of the road Telecommunication pipelines shall be arranged on the West or north side of the road in principle

.

The “four concessions” principle of pipe network construction: 1

.

9

.

Small diameter pipeline gives way to large diameter pipeline; 5

.

7

.

Bendable pipeline gives way to non bendable pipeline; 3

.

The pressure pipeline gives way to the non pressure pipeline

.

4

.

The location of the fire pump adapter shall not be designed in a high terrain as far as possible, and the well chamber of the water pump adapter shall not be lifted and lowered according to the terrain at will; 6

.

Examples of underground pipeline crossing layout: water supply pipeline shall be above drainage pipeline, gas pipeline shall be above other pipelines (except thermal pipeline), power pipeline shall be below thermal pipeline The heat pipe above other pipelines shall be above the combustible gas pipeline and water supply pipeline

.

5, 6, Henan flood, the eight construction enterprises donated 77 million! CSCEC / China Railway / China Railway Construction Co., Ltd

.

In order to control the intersection of landscape structures, garden sketches and greening group planting with the location of municipal comprehensive pipe network, affect the later garden construction, and even lead to the failure of acceptance of individual municipal pipelines, thus affecting the timely delivery and normal use of the project

.

7

.

No structures, trees and shrubs shall be planted within 1.2m around the outdoor gas surge tank; 5

.

Check whether there are water supply and drainage pipelines at the lowest point in the general landscape plan, including the lowest point of green space, pool and water system, and whether the landscape design elevation can meet the buried depth requirements of water pipes

.

As the pipeline is a non pressure pipeline, it should be carefully checked Check the slope making direction of each pipeline ➣ pay attention to the spacing between power and other pipelines, and review the greening landscape of garden construction: the comprehensive pipe network is not only restricted by underground and aboveground buildings, but also restricted by garden construction and greening landscape

.

There were 24-hour changes before and after the heavy rainstorm at a construction site in Zhengzhou! The project manager has cried faintly in the toilet..

.

8

. Lifting Insert

Generally, the drainage of garage roof is from the middle to the surrounding or both sides

.

Branch pipeline gives way to main pipeline; 4

.

In case of contradiction in the vertical position of engineering pipeline, the following principles shall be followed: 1

.

The optimization scheme can be determined after comprehensive comparison

.

The construction sequence of the pipe network: Measurement and setting out → foundation trench excavation → foundation construction → pipeline installation → pipe trench backfilling

.

10 million, MCC 20 million and CCCC 12 million! Click “watching” to let your friends know.

.

Confirmed cases were found at a construction site in Jiangsu! Two close contacts at a construction site in Anhui! Many places across the country have issued epidemic prevention notices on construction sites

.

The new pipeline shall allow the original pipeline

.

Single pipe gives way to double pipe 4

.

If you are careless, the water may not be discharged and the inlet pipe may not be connected

.