be careful! Since September 5, some sections of Jinzhou Road have been closed for construction

This article is transferred from the network, and the copyright belongs to the originator.

Before reading this article, please click the blue font above, and then click “follow”, so that you can receive our latest content for free.

The first section is from the South Gate of Guta park to the front of Wantong apartment.

If there is infringement, please contact us to delete.

There will be updates every day.

Loop Box

will carry out road breaking construction on the north side of Shiying South Street (200m north of Shengxi road to the front section of Wantong apartment) from September 5 to 27, 2021.

Traffic police detachment of Jinzhou Public Security Bureau September 3, 2021 source: Jinzhou traffic police[ 👇] click.

It is a free subscription.

Pay attention to the observation when vehicles pass through this section during the construction period.

Please pay attention to the traffic safety of passing vehicles and pedestrians.

Please rest assured to follow.

The construction is divided into three sections.

                                             According to the construction needs of urban heating pipe network and with the approval of the traffic police department, Jinzhou Rencheng Construction Engineering Co., Ltd.

After the construction, the second section from the South Gate of Guta park to Shengxi road will be constructed, and finally the section 200m to the north of Shengxi road will be constructed.