Planned construction period: the construction period shall meet the requirements of Party A according to the project progress; 5
.
Pricing method: Bill of quantities pricing, fixed total price lump sum within the scope of bidding drawings; 3、 Qualification requirements of the bidder 1
.
5、 Registration materials and requirements 1
.
6、 Other specific requirements shall be subject to the bidding documents
.
The bidder must have the qualification of general contracting of power engineering construction above level 5 (or professional contracting of power transmission and transformation engineering above level 5 (inclusive)) and the license for installation (repair and test) of power facilities above level 5 (inclusive); And have safety production license; 2
.
The tenderer must have a professional construction team, and the installation personnel shall have corresponding professional construction qualification certificates; 3
.
Quality requirements: acceptable; 4
Contracting method: contracting labor, materials, period, quality, safety and passing the acceptance of relevant departments; 3
.
Project overview: the project is located at the intersection of Dangtu Road and Zigong road in Suzhou, The planned land area is about 116.54 mu, with a total construction area of about 201992.34 square meters
.
Bidding information 1
.
Bidding unit: Suzhou shouchuang Jintian real estate development company 3
.
See the requirements of bidding documents, drawings and lists for details
.
Bid section division: one bid section; 6
.
Project location: Suzhou Suma Park 2
.
Registration time: August 31, 2021 ~ September 7, 2021; 2
.
Bidding scope: 1
.
Bidding announcement for construction of Suzhou Xiyue Huafu power supply project 1
.
Registration method: relevant qualification certificates of each unit (business license, qualification certificate, tax registration certificate, letter of authorization of legal representative or operator, ID card of registration representative, contact information, email, project performance data in recent three years, etc.) shall be sent to JTYYZX123@qq.com ; 3
.
7、 Contact: Wu Gong Tel.: 19805655022.
.
This bidding includes the construction of power supply works of the whole project
.
2
.
At least two or more similar power supply and distribution projects in recent 3 years without quality and safety accidents; 4、 The bid security, performance security and payment method are detailed in the bidding documents
.
All units that meet the qualification requirements of this bidding can apply
.
It is planned to build 21 8-11 storey foreign houses and 4 25 storey high-rise buildings, kindergartens, basement and civil air defense basement
.
Project name: Construction of Suzhou Xiyue Huafu power supply and distribution project 2
.