Construction is imminent! Benefit the residents of Xuzhou!

     Construction period requirements:   300 calendar days

.

Construction scale: the total length is about 1.835km, and the red line of the road is 36m wide

.

Construction content: Road, drainage, bridge, 3M * 2m box culvert, mountain static blasting, retaining wall slope excavation and support (about 11m high), etc

.

Estimated contract price: about 130 million yuan

.

See all contents in the bill of quantities and construction drawings for details( Click to view the large picture | the line is for reference only, subject to the actual situation) the line has changed! Compared with the design bidding announcement issued at the end of December last year, the line is shortened      The direct connection between this road and “Heping Road” will be another good traffic for both cuipingshan plate and daguozhuang plate, and the travel of surrounding residents will be more convenient in the future! Look forward to! source   Shan Shan, editor of Xuzhou public resources construction project trading platform   Responsible editor Xin Enron recommended Qingfeng “Xu” in the past 🧡 Guard the “Yang” light! After school, implement the “5 + 2” after-school service mode! The only Asian athlete elected! We Xuzhou girls are great! Click a sum.

.

The bidding for the East extension project of Guozhuang road starts, which means that it is convenient to travel again in the future! The main contents of the construction bidding for the East extension of Guozhuang road are as follows: construction location: Hanyuan avenue to Heping Avenue, Yunlong District, Xuzhou City

. Magnetic Box

Construction content: Road, drainage, bridge, 3M * 2m box culvert, mountain static blasting, retaining wall slope excavation and support (about 11m high), etc

.

It starts from Hanyuan Avenue and ends at Heping Avenue

.

   Bidding scope: the total length is about 1.835km, and the red line of the road is 36m wide, starting from Hanyuan Avenue and finally Heping Avenue

.