Fixing Socket Angular End Nail Plate
▲ latest rescue progress of Zhuhai Shijingshan tunnel flooding accident: temporary drainage of water from the reservoir above the tunnel
.
At present, the trapped people are still unable to contact
.
Zhang Yisheng, vice mayor of Zhuhai City, reported that after the flooding accident in the construction section of Shijingshan tunnel of Xingye Express (south section) project, the rescue work has made some progress through the hard work of all rescue workers day and night
.
At 13:00 this afternoon, Zhuhai City, Guangdong Province held a press conference to inform the latest progress in the rescue of the flooding accident
.
Beijing News our video product (ID: webvideo) according to CCTV news, at about 3:30 a.m
.
The teacher asked me to go to the Xiaojing shop of the Beijing News.
.
As of 12:00 on July 16, the rescue working face had advanced 395.3 meters into the tunnel, 764.5 meters away from the trapped point, and the water level in the tunnel continued to decline
.
The water level of the reservoir is reduced by taking measures such as Cofferdam at the permeable point, combination of forced pumping and culvert pipe drainage
.
yesterday (15th), a water seepage accident occurred in the construction section of Shijingshan tunnel of Zhuhai Xingye Express (south section) project, resulting in 14 construction workers being trapped
.
Editor Zhao Xi source CCTV news duty editor Kang Xixi was broken by “South Chen and North Li”! Go to their house and go to the University
.