From today on! This section of road in Yichun central urban area is semi closed construction!

Short Waved Anchor

During the semi closed period, you can drive normally from south to north, From north to south, you can drive to Yuanshan intersection and turn right (turn around to Bazhong intersection in the direction of the mall)

.

   Scroll up to browse the full text ↑↑↑ due to the upgrading of old roads and the connection of rainwater pipelines to upstream pipelines, the junction between Yuanshan road and Yichun Avenue in Yichun central urban area will be semi closed from August 18 to September 7

.

Source: released by Yichun   👇 click

.

In order to ensure road construction and ensure the safety and convenience of citizens’ travel, please drive in the direction indicated in the figure below

.

From east to west, you need to pass under the left bridge portal, and then turn right to the normal road section

.

Vehicles and pedestrians passing along the line, please slow down and follow the traffic guidance signs

.