The project crosses Wenruitang River with a total length of 663m, It is a two-way four lane bridge with a design speed of 40km / h, including a 382m long bridge – husk bridge.
The bridge breaks through the form of traditional flat bridge and adopts a bridge type of crossing the river.
The main bridge is a deck concrete-filled steel tubular arch bridge with a single span of 46.5m, with 8 on both sides × The 20m approach bridge, mainly in Chinese red, has the landscape effect of Red Bridge lying wave, and will become another scenic spot of Nantang pedestrian street…
In the early morning of September 5, the husk bridge on Shuanglong road in Wenzhou was fully opened to traffic! Jiang Wenguang Photo: after the completion and opening of the phase I road bridge project of Shuanglong Road (Nanpu road Longfang section) connecting Nanpu road and Longfang road in the urban area, it will greatly alleviate the regional traffic problems caused by the closed construction of Nantang bridge in the short term, effectively alleviate the traffic pressure of Wenzhou Avenue in the South and delimited Longqiao road in the north in the long term, and accelerate the development of Nantang west area.