Such constructors and technicians can become successful project managers!

Organize personnel to conduct on-site investigation and measurement to determine the temporary construction scheme, plane layout and temporary construction standards

.

Organize technicians to prepare various data required for the implementation construction organization design and commencement report (raw material investigation and determination of source, test mix proportion, personnel and equipment allocation and mobilization plan, etc.)

.

Prepare project planning (master various boundary conditions, analyze project characteristics, priorities, difficulties and countermeasures, clarify project section division and overall construction sequence, various resource requirements, construction period objectives, temporary construction planning, secondary operation planning, etc.)

.

For the quantities or labor involving drawing change contact list and visa, it is necessary to cooperate with the supervisor and Party A for confirmation( 2) Make a work plan for the next day after work every day

. Flat End Socket Cross Pin

Organize technicians to prepare various special schemes (temporary power supply, temporary construction, deep foundation pit support, dewatering, tower crane installation and removal, formwork, reinforcement, concrete, outer frame, etc.), and review them as soon as possible if they need expert review

.

Click to follow——— The dividing line of Wuhan Longcheng Construction Project Management Co., Ltd

.

For example, some nodes in some civil structure drawings do not correspond to architectural drawings, and some conflict with hydropower installation( 3) At the same time, you should be familiar with the atlas

.

Don’t confuse them

.

For example, due to the lack of coordination between hydropower installation and civil construction in a project, it is found that there are pipelines that are not embedded after the completion of concrete pouring and tamping, resulting in a series of rework( 2) Always pay attention to the construction dynamics, solve some problems encountered in the project in time, and report to the superior if necessary

.

2 be neither arrogant nor impetuous, and study carefully (1) in the construction process, if there is anything you don’t understand, you should ask for advice with an open mind, be patient to learn any useful technology, and be sure to be able to set out( 2) If you don’t understand something, you can ask the chief engineer or experienced team leader

.

4

.

Carefully sort out various boundary conditions and carry out understanding, analysis and evaluation

.

7 keep a distance and respect others (1) keep a certain distance from the principals of subcontractors and teams in daily work and life, and do not get too close to them, so as to prevent them from playing a human card and failing to deal with them correctly( 2) Every person on the construction site deserves respect

.

Various methods shall be carefully studied during the construction process

.

6

.

If you have time, look at the knowledge content in the books and remember better in combination with the actual situation on the site( 2) In spare time, if you have the ability, take other examinations related to various projects, enrich your ability and opinions to deal with things on the construction site, and lay a solid foundation for Professional Title Evaluation in the future

.

3 make a plan and keep a diary (1) after going to work every day, record the specific contents of each construction, take photos and archive each construction process

.

For example, if the team operators are not in place, the team leader shall be instructed to send additional personnel in time, and follow-up supervision shall be carried out( 3) Clarify the reward and punishment system, and give appropriate rewards to subcontractors or teams that perform well in the construction process; For the team that cannot complete the progress without special circumstances and has poor construction quality, it shall be whipped and a punishment notice shall be issued( 4) Make meeting minutes, analyze the problems found in each meeting, and urge the corresponding team or subcontractor to make rectification to see the aftereffect

.

must be unified if required by the local government.

.

5 hold more regular meetings and adjust work (1) assist the project manager to hold regular team meetings every week without limiting the number of times

.

You can also ask the workers about some construction steps, which may have some unique gains( 3) Take notes frequently, sort out confused or new knowledge, or write down complex construction processes

.

If you can do these 10 things well in management, you can become the project manager just around the corner! Basic skills required by technicians 1

.

Organize technicians to check the drawings, communicate the problems found with the design in time (ensure communication in the direction beneficial to us), and do a good job in design optimization planning

.

6 overall situation concept and overall consideration (1) it is the responsibility to do their own work well, and other engineers or employees should also stand up if they need help; For matters that are not within their jurisdiction, but in case of emergency, they can be handled first and then fed back as appropriate( 2) For the benefit of the project department, we should not waste costs, extravagance and waste, and prevent teams and subcontractors from cutting corners

.

9

.

When necessary, hold more meetings to ensure the smooth progress of the project( 2) In case of failure to complete the schedule, the reasons shall be analyzed

.

3

.

Various construction records, inspection lots, tests, measurement disclosure, monitoring records, safety patrol, technical disclosure, training records, meeting minutes, etc

.

Understand drawings and be familiar with Atlas (1) get drawings, check some problems existing in drawings and prepare for joint review of drawings

.

Organize personnel to identify hazard sources and environmental factors, and list hazard sources and environmental factors

.

If you respect others, others will respect you( 3) In the construction site, the most important thing is to do their own work well, and it is most important to learn well the knowledge of technology and management

.

Carefully study the bidding documents and contract documents, sort out the performance requirements, advance payment terms, change terms, temporary construction standard requirements, etc., and provide them to relevant responsible personnel for handling relevant materials to ensure the targeted development of relevant work

.

Specify various table styles

.

Requirements: deep planning, ingenious planning, careful planning and strict implementation

.

11

.

Prepare safety management measures and environmental protection measures; Prepare emergency plans and management plans for major environmental factors

.

5

.

2

.

8 after class research and improve yourself (1) in the first few years, try to get the second-class Constructor Certificate of this major, the additional items of other majors and the first-class Constructor Certificate

.

Chief engineer! 1、 Work contents in the preparation stage 1

.

It is best to find the corresponding atlas for reference and comparison where there is doubt

.

At the same time, we should also look at the whole site, reduce the secondary handling of materials and increase the utilization rate of materials( 3) Before construction, cooperate with each team to carefully check the drawings

.

For example, where concrete is to be poured, confirm with the owner and supervisor that the reinforcement and formwork works should be in place, contact the concrete company, whether the team members and equipment can be in place, weather reasons, etc( 3) The construction diary shall indicate the arrangement and completion of each type of work every day, so as to facilitate the adjustment and progress of the construction progress

.

For problems raised by subcontractors and teams, think more, discuss and seek solutions( 2) The drawings of this discipline shall be understood, as well as those of other disciplines, and the incomprehensible points shall be marked

.

For example, there are many processes when driving bored piles

.

—– as a technician, you first need to have the basic ability of a technician, and then do 36 things well in the construction process, you are qualified to become the chief engineer

.

10

.

Dynamically archive and scientifically use the relevant materials that play a major role in the project, and organize the main management personnel to carefully study and understand: contract documents: bidding drawings, bidding documents, addenda, construction contracts, construction drawings and various documents issued by the construction unit; Specifications, standards, procedures, standards, guidelines, etc; Construction unit and local government documents; Various investigation materials, agreements or written exchanges with relevant parties of the project; Relevant management measures or systems or documents of the enterprise’s superior; Management measures for completion data

.

8

.

If the design is inconsistent with the actual situation, communicate with the supervisor and the owner in time and issue a change contact list to avoid rework after construction

.

7

.

4 organize construction and coordinate in place (1) whether it is the construction process of civil engineering, hydropower installation and municipal road engineering, organize all teams and subcontractors to communicate and coordinate the nodes or parts of the construction synchronously before construction, so as to avoid returning to work due to inadequate coordination

.

If you want to please the superior leaders, you will put the cart before the horse, and the gains outweigh the losses

.

You can’t dictate by your own rights and responsibilities

.

Investigate, sample and test raw materials, and prepare the mix proportion required for commencement as soon as possible

.