What details should we pay attention to in the construction of exterior wall coating?

7.

When the exterior wall finish construction is completed, be careful to avoid damaging the wall surface before process handover and removing the hanging basket or scaffold; If any omission or hole is found, it shall be repaired in time.

In the process of spraying or painting wall paint, construction personnel shall wear protective masks to ensure their health.

1.

6.

If the finish paint is applied before it is completely dry, it may cause weak adhesion of the paint film, peeling, uplift, peeling, alkali flashing and other problems.

5.

Attention shall be paid to the maintenance of wall putty.

The company now offers free investment promotion, free training, free design, store opening support, advertising support and other one-stop services all over the country.

Materials shall be proportioned in strict accordance with the construction instructions.

However, to make a satisfactory wall paint construction effect, the following details should also be paid attention to.

Before the application of exterior wall finish paint in hot summer, the wall shall be soaked with water two hours before the putty construction, and each time the putty is scraped, it shall be cured with clean water after drying.

Shanxi Hongta coating is mainly engaged in: real stone paint, water in water, sand in water, Royal colored stone, internal and external wall emulsion paint and thermal insulation building materials.

Ensure the interval.

4.

Before construction, tools shall be cleaned and inspected to avoid dirt mixing into materials.

Before large-area exterior wall construction, try it on other boards first.

Scaffolding Adjustable Base Jack Nut

2.

When mixing materials, attention shall be paid to the accurate proportioning according to the proportional value in the instructions to avoid quality problems due to improper material proportion.

For more details, you can call the consulting company name: Shanxi Hongta Coating Technology Co., Ltd.

Pay attention to the protection of the wall surface after construction.

Service hotline: 0357-8688888                eighteen billion six hundred and three million five hundred and seventy-seven thousand six hundred and seventy   http://   www.hongtapaint.com         www.hongtacoatings.com     Exterior wall imitation stone paint selects Hongta Hongta coating to customize high-end “wall clothes” for you..

contact address: 200m west of Zhaodian village, Xincheng Town, Xiangfen County, Shanxi Province.

  Coating spraying for exterior wall coating construction, laymen seem to be a simple spraying process.

It is a comprehensive and diversified company; It is a comprehensive enterprise integrating production, sales, design and construction, with national secondary construction qualification; Among them, the new stone like paint building materials products developed by Hongta company are   In 2020, he was honored as the CCTV financial channel, became the CCTV exhibition brand, was successfully selected into the brand power project, and became the industry brand leader.

After confirming the brushing effect, large-area construction can be carried out.

protection work shall be done to avoid painting.

Hongta people serve you wholeheartedly.

Before large-area construction, try it first.

3.

The interval of construction coating shall be after the partition surface is dry, and then the finishing coat shall be applied.

Attention shall be paid to the protection of non construction areas to the places outside the wall, such as doors and windows, railings, floating windows, etc.

Before construction, tools shall be cleaned and inspected.

Your satisfaction is our pursuit.

8.

The health protection of construction personnel shall be done well.