Dust net construction @ where is the construction team of dust net manufacturer?

The detailed size, curvature and opening rate of the wind and dust suppression plate shall be planned according to the actual situation of the storage yard.

     (4) Construction of soil retaining brick wall with dust screen: in order to avoid coal slurry water overflow after rain and snow, 1.2-1.5m soil retaining brick wall can be set at the lower part of the wind retaining wall.

Dust net construction 13623181996 @ where is the dust net construction team? Dust net construction dust net construction dust net construction dust net construction dust net construction dust net construction dust net construction dust net construction dust net construction    Dust net construction planning and construction are mainly divided into four parts:       (1) Dust net construction underground foundation: the underground foundation shall be prefabricated concrete blocks or cast on site.

Trapezoid Rubber Magnetic Chamfer

https://lz1451468879.cn.china.cn/ 。.

The main body of the support is steel pipe, and the reinforced concrete pillar is selected as the support of “wind and dust suppression wall”.

The steel support is selected for support.

     (2) Dust net construction support structure: the project planning is based on the wind speed planning parameters.

Operating ambient temperature: – 40 ℃ to + 80 ℃, the connection shall be fixed with screws and pressing plates.

  Dust net construction 13623181996      (3) Dust net construction device: service life 15 ~ 20 years.

Secondly, the overall strength is considered.

The support mainly provides the “wind and dust suppression wall” with sufficient strength to resist the damage of strong wind.