Tangshan: due to road construction, several bus lines are temporarily bypassed!

32, No.

  On September 2, 2021, the temporary detour was constructed due to the replacement of thermal pipeline.

The temporarily added sites include hongxingli (east of Jianshe Road), Yuhua crossing of Jianshe Road, Ocean City (West of Jianshe Road and south of Changning Road), Changning crossing of Tangfeng road and west gate of Fengxiang park.

The specific detour conditions are as follows: No.

It starts from the east gate of Fenghuang flowers and goes to Longze intersection of Jianhua Road, bypassing Longze Road Beixin road returns to the original line.

The temporarily cancelled sites include Jinxiuyuan, cultural building, Fenghuang building and Diaoyutai (north of Longze Road).

32 road at the east entrance of gymnasium Road (Longze Road): it starts from Lantian building and goes to the gymnasium entrance of Jianshe Road.

The temporarily added stations include No.

4: starting from Tangshan station, go to the Beixin Road entrance of Wenhua Road, and temporarily detour Beixin road and Longze road to return to the original line.

The temporarily cancelled stations include: South Campus of Tangshan University (south of Chaoyang Road), power supply building, Yanshan building, community 70, Tangshan Evergrande city square, Longze intersection of Yuhua Road, lvjinyuan (West of Longze Road), Longze road sub branch of Chengde Bank (north of Chaoyang Road), and the temporarily added stations include: South Campus of Tangshan University (east of Huayan Road), Yuhua Road crossing of Huayan Road, Yufeng Building Yuhua Jiayuan, Zhanggezhuang community (West of Tangfeng Road), lvjinyuan (east of Longze Road) and fengxiangyuan (north of Yuhua Road): starting from the initial and terminal station of Longhua Road, go to Chaoyang crossing of Jianshe Road, and temporarily bypass Jianshe Road, Changning Road, laotangfeng road and Yuhua Road to return to the original line.

The temporarily cancelled stations include Tangshan Sports Park Station (south of gymnasium Road), culture building and Phoenix building.

67 were cut off.

60 road in community 24: starting from Mingshi Donghu New Town, heading to gymnasium crossing of Jianshe Road, temporarily bypassing Jianshe Road Beixin road returns to the original line.

The temporarily added sites include Diaoyutai (West of Longze Road), east entrance of gymnasium Road, rehabilitation hospital, Tangshan Industrial Museum and Fenghuangshan park.

The temporarily cancelled stations include Fenghuang building, cultural building and the east entrance of gymnasium road.

24 community, Beixin road crossing of Jianshe Road (east of Jianshe Road), Meiyi road crossing of Jianshe Road, and you7 road of Tangshan Sports Park Station (West of Jianshe Road).

30: the temporary detour due to the construction of Chaoyang Road was cancelled, and it was adjusted to start from Tangshan station and travel to Chaoyang Road intersection of Huayan Road, temporarily detour Huayan Road Yuhua Road, Tangfeng Road, Chaoyang Road, Longze Road, Yuhua Road and Huayan road return to the original line.

It temporarily bypasses Jianshe Road and Beixin road to return to the original line.

   September 2, 2021 source: Tangshan bus..

The temporarily added stations include Tangshan Sports Park Station (West of Jianshe Road), Meiyi road crossing of Jianshe Road, Beixin road crossing of Jianshe Road (east of Jianshe Road), No.

The temporarily cancelled sites include Yanshan building and Zhanggezhuang community.

4, No.

60 and you No.

Passengers can call 5266000 customer service hotline or log in to Tangshan bank app to query the real-time operation of the vehicle.

Temporary detour due to the construction of full-scale disconnection of Wenhua Road (gymnasium road Beixin Road) due to the road renovation and reconstruction, the passing bus lines No.

The details are as follows: No.

The temporarily added stations include Fenghuangshan Park, Tangshan Industrial Museum, rehabilitation hospital and No.

From September 6, Jianshe Road and the east side of Chaoyang Road intersection were completely cut off, and the temporary detour was made from the date when the two bus lines of No.

During the detour, in case of road obstruction or other special circumstances, obey the on-site command of the traffic police.

The specific recovery time shall be subject to the notice after the completion of construction.

7 will be temporarily detoured from the date of disconnection.

30 and No.

The temporarily cancelled stations include Fenghuang building, cultural building and Tangshan Sports Park Station (south of gymnasium Road).

The specific recovery time shall be subject to the notice after the construction is completed.

Magnetic Recess Former

Passengers can call 5266000 customer service hotline or log in to Tangshan bank app to query the real-time operation of the vehicle.

During the detour, in case of road obstruction or other special circumstances, obey the on-site command of the traffic police.