The support mainly provides the “wind and dust suppression wall” with sufficient strength to resist the damage of strong wind.
Windbreak construction 13623181996 @ where is a windbreak construction team? Construction of windproof net construction of windproof net construction of windproof net construction of windproof net construction of windproof net construction of windproof net construction of windproof net The construction planning and construction of windbreak net are mainly divided into four parts: (1) Underground foundation of Windbreak Net: it is made of precast concrete blocks or cast-in-situ underground foundation.
Secondly, the overall strength is considered.
The main body of the support is steel pipe, and the reinforced concrete pillar is selected as the support of “wind and dust suppression wall”.
(4) Windbreak net retaining brick wall: in order to avoid coal slurry water overflow after rain and snow, a 1.2-1.5m retaining brick wall can be set at the lower part of the windbreak wall.
(2) Support structure of Windbreak Net: the project planning is based on the wind speed planning parameters.
The detailed size, curvature and opening rate of the wind and dust suppression plate shall be planned according to the actual situation of the storage yard.
https://lz1451468879.cn.china.cn/ 。.
The steel support is selected for support.
Construction of windbreak net 13623181996 (3) Windproof net device: service life 15 ~ 20 years.
Operating ambient temperature: – 40 ℃ to + 80 ℃, the connection shall be fixed with screws and pressing plates.