[Chengde decoration] how to do the dry goods floor heating installation project? Construction process flow diagram!

Flushing and pressure test 10.

After the ground is cleaned, check whether the ground elevation meets the dimensional requirements of floor heating construction.

Pouring of floor heating protective layer and inspection of ground pipeline to make ash cake (spacing 1m) × 1m) protective layer, check the ground elevation before pouring, support the four corners of the floor heating pipe with formwork, and pour concrete for curing.

11.

Foot Mounted Anchor

Today, we will systematically learn the construction process of floor heating.

4, reflective film laying 5, steel wire laying 6, heating pipe laying, if the project facing layer is stone and floor, in order to ensure that there will be no quality problems such as stone cracking and floor arches in the course of the later floor heating, the foam expansion joints will be added every 3 meters in the concrete protection layer to adjust the base level changes.

Installation 12, pressure test and commissioning of water separator and collector.

7.

2.

Because it has a series of unique advantages compared with other heating systems, such as economy, energy saving and comfort, it is quickly accepted by people and has been rapidly popularized in the society.

3.

During the construction of finishing layer installation surface layer, the team shall not cut on the ground at will to avoid damaging the pipeline.

1、 Process flow of floor heating construction 1.

Clean the ground.

9.

Flushing and pressure test 8.

With the continuous progress and development of China’s society, the gradual improvement of people’s living standards and the rapid development of housing industrialization, the process of promoting and popularizing floor heating in China is accelerating day by day.

Lay the floor heating main pipe, and the floor heating main pipe shall be firmly fixed with riding code.

Laying of insulation board during the laying of insulation board, attention shall be paid to controlling the details of nodes (wall side and expansion joint).