The temporary detour is as follows: No.
The temporarily added stations include Longquan south building, Changning bridge and Chengcheng Shangpin No.
62: it starts from Yinhe road yard, goes to longfu South Road crossing of Hexi Road, and temporarily detours Hexi Road and Changning Road to return to the original line.
68 Road: it starts from the second bus company and goes to Longze intersection of Changning Road.
September 7, 2021 source: Tangshan bus..
Please make preparations in advance for travel.
The temporarily added sites include Chengcheng Shangpin, Changning bridge and Longquan south building.
The specific recovery time shall be subject to the notice after the construction is completed.
Temporary detour due to the construction of rainwater pipeline reconstruction project, longfu South Road (Gongnong Road Hexi Road) is cut off in full.
During the detour, in case of road obstruction or other special circumstances, obey the on-site command of the traffic police.
You can call 5266000 customer service hotline or log in to Tangshan bank app to query the real-time operation of the vehicle.
The temporarily cancelled sites include Longyuan new house, longfu South Road, Longquan Xili and Longnan.
It temporarily bypasses Changning Road and Hexi Road to return to the original line.
The temporarily cancelled stations include Longnan, Longquan Xili, longfu South Road and Longyuan new house.