Chengdu Metro maintenance project construction daily

I.

Chengdu Metro maintenance project construction daily, Tuesday, September 28, 2021, weather: cloudy, temperature 18 ~ 30 ℃.

(2) Equipment mobilization:     No new mobilization equipment.

output value completion (10000 yuan) 1.

reason analysis and measures to be taken for incompleteness of today’s plan     VII.

Planned daily completion date completed per capita output value week planned weekly completion ratio 1.171.170.2372.1330.4% planned monthly completion ratio in February planned annual cumulative completion ratio 25.2220.1179.7% 239.7150.4121% 2 Completion of construction progress project unit list quantity daily plan date completion monthly plan monthly completion proportion cumulative completion of 15 stone supporting plates______ Anti theft rolling shutter door replacement sleeve 4______ Demolition of original wall surface ㎡ 107570.270.260150.4250.7% 940.4 wall brick paving ㎡ 2500__ 200100% 1973 wall uprooting ㎡ 4032.5__ 28002800100% 3627 wall painted with emulsion paint ㎡ 3540__ 28002800100% 3058 dry hanging wall removal block 100______ Fabrication and installation of 100 dry hanging access doors______ Demolition of subsidence area ㎡ 400______ Backfilling ㎡ 400______ Plain concrete cushion pouring ㎡ 400______ Restoration of wind Pavilion and flower platform m514__ 42028067% 326 stone floor restoration ㎡ 200______ Replacement of lower trim panel of escalator ㎡ 105______ Artificial stone ㎡ 30__ 3000% 0 granite ㎡ 100__ 10000% 0 2.1 M2 stainless steel door body shall be added at entrance / exit g of Dongda road______ Add steel ladder cage M9______ Add vertical column flat iron m270______ Protective net foundation masonry M50______ Installation of protective net M50______ Installation of railing M3______ Tiling ㎡ 1______ Floor drain 1______ Install pipe M10______ Removal of original water retaining network ㎡ 129______ Procurement and installation of water retaining network ㎡ 129______ Removal and restoration of stone floor ㎡ 24______ Gate guide conduit and cable laying M800______ Ladder guide cable laying and installation M1000______ Water pipe insulation cotton (procurement and installation) ㎡ 490______ Removal and restoration of ceiling and smoke retaining vertical wall m360______ Demolition of the original fireproof board and procurement and installation of new fireproof board ㎡ 800______ T8 / 230VAC / 18wled lamp tube replacement (procurement and installation) 400 sets______ T5 / 230VAC / 18wled lamp tube replacement (procurement and installation) set 98______ 300 * 1200 / 230VAC / 40wled panel lamp (procurement and installation) 75 sets______ 300 * 1200 / 230VAC / 40wled panel lamp (emergency) (procurement and installation) 40 sets______ Electrical piping sc25 (procurement and laying) m1810157157500277.555.5% 277.5 power cable dwnzb-yjy-3 * 2.5 (procurement and laying) m181017317350029358.6% 293t8 / 230VAC / 2 * 20wled three proof lamp set 250______ Evacuation indicator set 1611212502142% 21230vac / 13wled downlight set 1361______ T5 / 230VAC / 18wled lamp sleeve 164______ East China continent, niuwangmiao station lighting light transmission plate (procurement and installation) 500m2______ A 6 * 1.3 * 1.75m inspection and repair pit for dual-purpose vehicles is added in Hongliu depot__ 100% 0 waterproof treatment for the bottom of driving machine foundation pit in Sichuan division depot 185m2__ Four anti-theft nets shall be installed in the pump room of 18500% 0 Banqiao depot__ The 400% 0 Banqiao depot shall be equipped with a channel door pocket 1 between the pumps__ 100% 0 Universiade key station toilet facilities maintenance station 24______ 3、 Construction operation management personnel and equipment input s / n project construction personnel management personnel equipment input remarks 1 decoration team 21__ 2 electromechanical team 41__ 4、 Safety production situation of working face at each work point of the project original wall demolition and addition of evacuation instructions v.

8、 Memorabilia    None..

Mobilization of equipment and materials today (1) material mobilization:      Evacuation instructions and cables.

construction plan for tomorrow project unit list quantity day plan to complete wall brick paving ㎡ 2800351973 evacuation instruction set 161921 electrical piping m181090277.5 power cable laying m181090293 VI.