[construction] necessary for safety inspection after resumption of work! Eliminate more than 90% of potential safety hazards on the

  2.

In case of failure of electrical lines, devices and electric tools on the equipment, they shall be handed over to the electrician for repair.

2.

(5) the fire extinguisher must be used in time when the fire occurs on the construction site.

This is the “post Festival syndrome”, which is a very dangerous hidden danger, It’s very accident prone.

  (7) When working or walking on the scaffold, pay attention to the probe plate under your feet.

Work at heights (1) before operation, shelves, platforms, channels, protective railings and protective covers at openings shall be carefully and carefully inspected to eliminate hidden dangers.

If it is necessary to work within the range where the upper object may fall, an isolation protective layer shall be set between the upper and lower layers.

(3) The hot work site shall be equipped with sufficient fire-fighting facilities and keep the fire-fighting road unblocked.

Their free and loose heart has not been recovered, mainly reflected in fatigue and emotional instability.

(7) It is strictly prohibited to move, dismantle or stop the limit, alarm and other equipment safety accessories of construction machines, tools and equipment without authorization (8) it is strictly prohibited to damage or steal the safety equipment and protective facilities of on-site machines, tools and equipment.

1、 Get rid of the “post Festival syndrome” and return to the construction site after the Mid Autumn Festival and national day.

Stop staying up late and socializing, go to bed early and get up early, adjust work and rest as soon as possible, and slowly adapt to the previous regular work and rest time.

(4) It is strictly prohibited to throw objects and equipment from high altitude (5) it is strictly prohibited for the guardian responsible for high-risk matters such as radiation operation, initiating explosive devices, hazardous chemical loading and unloading to leave the post without permission.

3.

(7) Hand held power tools must be effectively grounded unless they are approved double insulated tools.

To this end, we should do the following: 1.

Earth excavation (1) the permit for earth moving work must be obtained before excavation (2) the excavation with a depth of more than 1.2m shall be sloped or supported (3) hard enclosure shall be installed around the excavation area (one meter from the edge) (4) there shall be warning signs on the enclosure.

Make your daily life orderly and adjust your mental strength and mentality back to work.

(3) All kinds of materials shall be placed on the ground by tether or sliding.

Wind, rain and snow seriously affect their safety.

They shall not be disassembled by themselves.

(4) Before hot work, the surrounding combustibles shall be removed, special personnel shall be assigned to watch the fire, and inspection shall be carried out after operation.

(2) Wear tight work clothes, anti-skid shoes, safety helmet and safety belt during operation.

Electric fire should not be extinguished with water and foam extinguisher to prevent electric shock.

Teach you the necessary skills for building a good temple.

Lifting and hoisting (1) warning shall be set up for lifting and hoisting operations, and no personnel are allowed to walk or stay under the hoisted objects; (2) Lifting drivers, commanders and drivers shall hold certificates, and commanders shall have identification clothes; (3) Rigging, spreader, limit device and control system shall be checked and confirmed before operation; (4) Hoisting operation is not allowed in strong wind, fog, dust, rain and snow above level 6 (inclusive); (5) The crane boom and lifting objects shall be kept at least 2m away from the edge of overhead power lines..

(4) Any electrical appliance without experience of electricity shall be deemed to have electricity and shall not be touched by hand.

The key parts such as the device shall be strictly inspected to keep the equipment stable, sensitive, reliable and firm and ensure the safety of the operation machinery.

3.

Although people arrive at the construction site, their heart is still at home and their thoughts are not concentrated.

They are not allowed to lay lines and install temporary power supply by themselves.

6.

2、 Before returning to work, some machinery, equipment, protective facilities, scaffolds and electrical equipment on the site are out of service for a long time.

The canteen on the construction site shall be disinfected and sterilized before opening.

Enough space and passage for two people to operate at the same time shall be reserved around, and no sundries that hinder the operation shall be stacked.

Hot work (1) the permit for hot work must be obtained before hot work.

5.

Click to ask the source: the copyright of Shanghai construction site and Douding construction belongs to the original author.

(9) In case of heavy fog, heavy rain and strong wind above level 6, stop working at heights.

Whether the formwork support system, deep foundation pit, construction power, large machinery, construction site fire protection, long-span and steel structure, scaffold, unloading platform, employees’ residence, food hygiene and safety, etc.

4.

If they are not inspected, repaired and reinforced, they will become hidden dangers and lead to accidents.

We should achieve “people arrive at the scene, heart to post”.

The foundation of hoisting machinery, the connection and fixation between machinery and foundation, safety and limit devices and other key parts shall be strictly inspected to keep the equipment stable, sensitive, reliable and firm and ensure the safety of operation machinery.

5.

(2) Do not store articles in the distribution box and switch box to prevent electric shock.

(9) In the temporary dormitory, it is not allowed to connect wires in violation of regulations and use high-power electrical appliances such as fast heating and iodine tungsten lamps without permission.

(8) It is not allowed to rest under high-altitude operation, near edge, hole edge or relying on temporary guardrail.

4.

(2) The operators of electric welding and gas welding must hold the operation certificate of special type of work issued by the government department; Wear qualified safety protection articles.

(6) Timely check whether the lighting at night meets the requirements, and replace the damaged lighting equipment in time.

(9) It is strictly prohibited to carry out electrical work of live or pry open box transformer for wiring without authorization.

(2) Strictly abide by the access control management system, swipe the card to enter the site, and consciously accept the security inspection.

(6) It is strictly prohibited to move or dismantle the safety protection facilities such as scaffold, steel grating, guardrail, cover plate and protective net in use without authorization.

“Zero tolerance” clause (1) fighting, drinking and taking drugs are strictly prohibited.

(6) Do not work on the same vertical plane when working up and down cross.

1.

Strictly inspect the foundation, wall connecting parts, diagonal bracing, cross bracing, fastener bolts and other key parts of the scaffold and formwork support system to ensure the connection of the structure, the fastening of members and the stability of the frame foundation.

It is worth paying attention to the whole process of policy, planning, financing, design and construction, and the necessary skills for the abbot of the temple.

4.

Before using electricity, professional electricians shall check all lines and electrical equipment one by one to ensure the integrity of lines and equipment and the sensitivity and reliability of leakage switch.

(5) Personnel who drink or take drugs such as drowsiness and excitement shall not engage in work at heights.

The canteen using natural gas shall carefully check the pipeline and valve switch.

7.

(5) Non electricians are not allowed to repair all kinds of switching appliances.

General requirements (1) all personnel entering the construction site must wear work clothes, safety shoes and safety helmets.

Before the resumption of deep foundation pit (including excavated pile), in addition to carefully checking whether there is deformation, ventilation shall be conducted before operation to eliminate residual gas and maintain air circulation.

(8) Before using electric tools that are not used for a long time or are affected by moisture, a professional electrician shall first measure whether the insulation resistance meets the requirements.

(6) Strictly implement the hot work system and achieve “three no hot work”: no hot work without the approved “hot work permit”; No fire prevention measures or hot work measures are not implemented; No hot work without hot work supervisor.

If you have any problems in the process of building the temple, please leave a message and ask questions.

  (3) It is strictly prohibited to engage in various special operations without certificates or false certificates.

3、 Safety control during construction 1.

6.

Many people are still immersed in the happy atmosphere of the festival.

meet the safety production standards.

  High altitude hot work welding safety use of gas cylinders safety use of gas cylinders 7.

It is prohibited to hang wires in disorder and dry clothes on wires.

Straight Anchor

  (2) It is strictly prohibited to work at heights without wearing safety belts or life jackets for water operations.

Temporary power use (1) strengthen the careful inspection of temporary power facilities (distribution box, switch box, cable, leakage protection device and all electrical lines, etc.), and eliminate hidden dangers in time.

Eat more vegetables and coarse grains to ensure balanced nutrition.

In order to start the construction smoothly and avoid potential safety hazards, we should do the following things in advance.

2.

(3) For temporary electric facilities, leakage protectors meeting the specification requirements must be installed.

(4) Operators shall not play with each other to avoid falling.

3.

Temporarily unused tools shall be put into tool bags, and materials shall not be thrown downward.