Construction technology of fabricated Engineering – installation process of ALC partition board

2) the pressure groove treatment at the connection between the inner wall plate and the structure is convenient to hang the net and prevent cracking.

3) Decorative plastering shall be closely coordinated with water, electricity, heating, sanitation and communication.

ALC board, as a new building material with superior performance, is favored by the industry.

5.

2.

2.

Because its texture is loose and porous, it is a good heat preservation and sound insulation material.

conclusion      From perfection to construction, ALC light partition board new process should deeply consider each process, and systematic and comprehensive measures must be adopted to solve it.

V.

2.

ACL board material is green and environment-friendly, with good sound insulation and fire resistance, which far exceeds the requirements of class A1.

At present, it has been widely used in high-rise frame buildings and internal and external walls of industrial plants.

Elastic materials should be used for surface decoration construction.

It is forbidden to drill holes, drill holes and pick grooves afterwards.

III.

to prevent the exposure of iron sheets, and construct the top node by pipe clamp method.

When landing, a sleeper shall be placed at 600mm at both ends of the plate.

The board has light weight and small design load.

Doors less than 1500 shall be laid aside with 100 plates and reinforced with split bolts.

Preface      With the development of science and technology, building materials are changing with each passing day, and various wall materials are constantly updated and promoted.

3.

When making wallboard, due to the thin plate, the building use area is expanded.

4) The surface course shall be cured in time after construction, and all collisions are prohibited within 3 days.

  2) Plate quality: do not use plates whose technology cannot meet the national requirements or whose ingredients and technology are unreasonable   3) Construction management: in order to meet the construction period, the wallboard that is not old enough for 28d shall not be sent to the site for use   4) Moisture proof protection: moisture proof measures shall be taken at the transportation and construction site to prevent moisture   5) Drawing deepening: communicate with the interior wall panel company about drawing deepening 1-2 months in advance     Optimization direction 1) the clear height of the structural beam bottom shall be unified as far as possible to reduce the number of types of plates due to different heights.

Pipe clamp method construction plan     Treatment measures 1) determine the direction, consider the ceiling, etc.

During hoisting, special personnel shall be assigned to command, the binding distance of sling at both ends of the plate shall be consistent, and the sling shall be smooth and straight to ensure that both ends of the plate are off the ground and landing at the same time.

ALC light partition board has the advantages of convenient installation and fast construction speed.

    2) If there is a painting layer, it is recommended to use gypsum mortar for painting, which has small shrinkage and reduces the risk of wall cracking.

Plate seam treatment    The joint between plate and beam at the connection point of plate and plate is cracked     Treatment measures 1) the mortise and tenon between ALC light partition board and board shall be naturally engaged without extrusion adhesive to form deformation joint; After installation, the stability period is more than one week, and the grid cloth shall be pasted to glue the closed plate surface.

    Bottom node drawing of pipe clamp construction 7.

In order to facilitate the transportation of plates, the number of stacking layers during unloading shall not exceed two, and when conditions permit, they shall be stacked in one layer.

③ The installation of indoor doors shall be reinforced with section steel.

3) Door opening treatment: ① hanging structural plate should be used above the door opening.

Fig.

The embedding and reservation of all parts shall be completed and passed the inspection and acceptance.

2) during wall installation, it must ensure that the slurry at the top is dense, the lower part is plugged with a wooden wedge, and a 30mm gap is reserved at the lower opening.

4.

Wing Nut Tie Rod

Door openings greater than 1500 shall be hung with section steel, and door entry doors shall be reinforced concrete door frames.

I.

The pin position should be 300 ~ 400 away from the top and bottom of the partition wall.

The pin spacing is about 700.

When deepening ALC light partition board, communicate with the design institute and consider using solid bricks for construction.

Corner or T-shaped treatment method 5) due to the material characteristics of ALC light partition board, it is not suitable for walls less than 200mm wide.

5) It is better not to use ALC light partition board wall for unit household wall, and it is recommended that the design institute change it                                                         4.

For decoration, the alkali resistant glass fiber grid cloth must be bonded at the plate joint to resist cracking.

1) the length of ceramsite plate wall and ALC light partition wall is greater than 6m, If it is less than 12M, the structural column shall be set in the middle.

It is believed that ALC light partition board will have broad development prospects and will be vigorously promoted after gradual improvement.

The total depth of the pin anchored into two plates in different directions shall not be less than the thickness of one plate plus 150mm.

Elevation of distribution box     Treatment measures   1) Special shaped plate shall be made for the distribution box and embedded in the special-shaped plate;   2) It is strictly prohibited to slot and bury the distribution box after the wall panel is installed;   3) The distribution box shall be embedded and reinforced in the plant; If it cannot be embedded and installed in the factory, it must be embedded and installed on the site before the wall panel is installed (on the wall).

6.

4) Application of corner or T-connection of partition board φ 6 pin fixing.

Masonry wall material of water absorbent toilet      Treatment measures: toilets and other parts are easy to be immersed in water, and ALC materials have good water absorption.

The slotting shall be carried out with professional tools, setting out first, and then slotting; 4) Crack resistant mortar repair construction is allowed at an interval of 7 days after the installation of water and electricity pipelines.

2) Corner door stack: ① the pins of corner wall and T-shaped wall must be constructed according to the drawing and connected by special repair materials of plates.

The width of the grid cloth shall not be less than 300mm and shall be set in the middle along the plate joint.

No operation shall be carried out on the wall during the standing period.

   ALC lightweight partition board, also known as autoclaved aerated lightweight concrete board, is a new building energy-saving product; It has the advantages of light volume weight, good sound insulation and heat preservation effect, low cost, simple installation process, low construction period requirements, industrialization of production, standardization and installation industrialization.

② The floors of tube wells, toilets and other buildings that are often flooded shall have anti sill.

Starting from the production and processing of wallboard materials and construction and installation, we should constantly solve problems and improve the process.

ALC light partition board installation process step 1: plate snapping line step 2: plate cutting step 3: fixing U-shaped card step 4: plate installation step 5: verticality calibration step 6: flatness calibration step 7: bottom joint filling mortar step 8: top joint foaming agent filling step 9: plate hanging mesh patching step 10: on-site slotting four risk points control 1 ALC light partition board has low strength and is easy to be damaged during transportation          ALC light partition board stacking            ALC light partition board handling         Treatment measures   1) Hoisting and stacking: nylon sling (not steel wire rope) shall be used to bind 600mm at both ends of the plate during hoisting, and the weight of each hoisting shall not exceed 2T.

② Plates less than 100m shall be poured with secondary structure as far as possible.

3.

In this project, the short leg walls and door piers with the edge of door pier less than 200mm are constructed by secondary structure, planted reinforcement, equipped with 2 8mm threaded reinforcement and filled with C25 fine aggregate concrete.

Source: Qingjian International Technology Center ▼ -.

ALC light partition board layout, slotting, slotting, cutting width is not limited, and the depth should not be greater than 1 / 3 of the plate thickness     Treatment measures 1) before the installation of ALC light partition board, the layout design must be carried out according to the modulus, and ALC wall board less than 200 shall not be used; 2) Typesetting shall be carried out in principle in the middle of the small board and on both sides of the large board; 3) The water and electricity can be slotted 14 days after the installation is completed.

There are no special-shaped plates at the corners (internal and external corners) and door stacks in the detailed layout of the secondary structure, and structural columns need to be cast in place locally.

After the wall has stood for at least 7 days, the wood wedge shall be removed and the bottom 1:3 cement mortar shall be filled.