Construction technology | what should the project manager do to manage a project well?

Cooperate and assist all departments of the company in the bidding work in the early stage of the project and prepare the construction organization design.

2.

After the foundation is excavated to the design elevation in the drawing, organize all participating units of the project to inspect the foundation trench.

3、 Proactively and regularly report the progress, safety and quality of the project to the company’s leaders.

If it is a residential commercial house, the construction and supervision units shall be invited to conduct acceptance one by one.

Quality control is the task of quality control to ensure that the construction quality meets the requirements of design and specifications.

Inform the construction, supervision unit and planning department to conduct joint line inspection, mainly to check whether the construction is set out according to the coordinate points set by the planning department.

Safety is a major event involving the interests of individuals and the company, Therefore, safety work is the top priority of the project manager.

of the project shall be indicated.

(4) Safety disclosure shall be made before the construction of each process.

2.

After passing the inspection, the construction of the next process shall be carried out.

8.

After the construction of main divisional works is completed, the project department shall conduct self inspection and pop up the axis and elevation for acceptance.

The axis of the building is drawn with small wooden stakes and lime powder.

(3) During the construction process, the management personnel shall track the workers for construction technical guidance, and timely correct the problems found.

5.

14.

The construction elevators, derricks and tower cranes used in construction must be installed by qualified units, tested and reported to the local construction administrative department for filing before use.

After the completion of decoration divisional works, electrical, water supply and drainage, fire control and HVAC construction, the project department shall conduct self inspection and pop up the axis and elevation.

Progress control time is profit.

7.

Star setting: enter the official account home page, click on the top right corner, click “set star”, and yellow star corner will appear next to the official account name (Android and iOS user operation alike).

Organize all participating construction units of the project to participate in the joint review of construction drawings.

18.

(4) Managers should communicate and communicate with workers at ordinary times, be patient and give technical guidance to workers, so that workers can feel that you are both project managers and friends.

Organize all participating units of the project to carry out project completion acceptance, and improve the signing and sealing procedures of project data.

//Wechat public account setting prompt///   The official account is official.

During the construction process, each divisional works shall be notified to the construction and supervision unit for acceptance.

(2) After entering the site, the workers shall explain the quality objectives of the project (qualified, high-quality project, structural cup, etc.).

21.

2、 Cooperate with relevant departments of the company to do well in project related work.

9.

(2) The safety management system shall be indicated when signing the labor subcontract with the labor construction team of the project.

First, obey the work arrangement of the company’s leaders.

The project manager needs to have these overall abilities: be familiar with the construction drawings, be proficient in the construction specifications, technical regulations and relevant contract law, construction law, safety production management regulations, etc., formulate the attendance and performance assessment of the management personnel of the project department, and deal with the interpersonal relationship of each participating unit of the project; Draft and sign various labor subcontracting contracts.

(5) The “three inspection” system shall be implemented for the project (workers’ self inspection, mutual inspection and handover inspection after the completion of each sub item) and the construction of the next process shall be carried out after passing the inspection.

Apply to the construction and supervision units for commencement and confirm the commencement date.

Organize all participating units of the project to carry out foundation acceptance, and improve the signing and sealing procedures of engineering data.

During the construction process, the engineering data must be synchronized with the construction progress.

If you don’t want to miss the highlight of this official account, please put the public number of construction technology as the star sign and click “collect”, “look at” and “Zan” at the end of the text, so that each new article will appear in the subscription list at the first time.

The details are as follows: 1.

During the construction of main divisional works, the construction and supervision units shall be informed of the acceptance of each divisional works.

Organize mechanical equipment and workers to enter the site for construction, excavate the foundation or carry out pile foundation construction.

(1) When signing the labor subcontract with the labor team, the construction quality grade requirements, corresponding technical requirements, construction specifications, allowable deviation of quality, etc.

The project manager shall control the whole process of the following project operation processes to ensure the smooth completion of the project: 1.

20.

(1) It shall be implemented in strict accordance with the standards for construction safety inspection, Atlas of quality and safety management standardization and the management systems of the company and the project department.

12.

At the same time, make plans for funds and materials, and arrange the mobilization of materials and mechanical equipment as required.

6.

5、 Manage the management personnel of the project department well, be able to communicate, cooperate and unite within the team, divide labor and cooperate, and give play to the cohesion of the team.

If a project cannot be completed on schedule, the cost will increase greatly..

22.

What should the project manager do to manage a project well? Here are 22 major events and 4 abilities summarized by excellent project managers, which run through the whole construction process! First, let’s talk about some basic requirements of the project manager.

15.

During the construction process, the engineering data must be synchronized with the construction progress.

During the construction of electrical, water supply and drainage, fire protection, HVAC and decoration, the construction and supervision units shall be informed of the acceptance of each subdivisional project, and the construction of the next process shall be carried out after passing the acceptance.

19.

Lifting Eye Anchor

17.

16.

6、 Formulate various management systems and corresponding post responsibilities of the project department, and formulate the performance appraisal system for managers of the project department.

Organize the management personnel of the project department to be familiar with the drawings, make the general layout plan of the construction site, and make the general layout plan of the site.

3.

In the construction process, the management personnel shall immediately correct the illegal operation of workers and patiently teach the workers.

10.

(3) When workers enter the site for construction, first organize the management personnel of the project department to carry out safety knowledge education, training and Q & a explanation for workers, do a good job in three-level safety education and written signing and filing procedures, and do a good job in audio-visual materials.

The next process can be carried out after passing the acceptance.

The main work of the project manager in the whole process of construction must be hard.

In short, ensure that the project is constructed according to the drawings and the construction quality meets the requirements of the design and relevant specifications.

Safety management, safety first and prevention first.

Sort out project data and conduct project settlement.

Fast progress can create benefits.

3.

If a project is not constructed under safe conditions, everything is equal to zero.

Select the project labor construction team and sign the labor subcontract with the consent of the superior leaders.

After the construction of foundation divisional works is completed, the project department shall conduct self inspection and pop up the axis and elevation for acceptance.

13.

Supervise the construction of temporary facilities on the construction site according to the general layout of the site, including gate, enclosure, project office, workers’ dormitory, canteen, temporary road hardening, gate car washing platform, temporary construction wire and line erection, electric box installation, etc., so as to ensure that the construction site meets the commencement conditions.

The project manager should manage a project well from four aspects: safety, quality, progress and cost control.

After the foundation trench inspection is qualified, the foundation divisional works shall be constructed.

NOCITCE changed the push rule because of WeChat official account.

11.

According to the signed construction contract, the project department shall be established according to the scale of the project.

Urge the construction management personnel to carry out the survey and setting out of the building according to the coordinate points set by the construction unit and the Survey Institute.

Organize all participating units of the project to conduct main body acceptance, and improve the signing and sealing procedures of engineering data.

Strictly speaking, project manager is the head of the whole project, and is responsible for the quality, safety, progress and cost of the project.

4.

4、 Actively communicate with all participating units of the project and improve interpersonal relations.

This requires the project manager to control the whole process of the project, ensure the normal construction and operation of the project, save costs and create the maximum economic benefits.

Cooperate and assist the construction unit in the application for construction, supervision and handling of construction permit, so as to ensure that the project starts as soon as possible.

In the construction process, the engineering data must be synchronized with the construction progress.