The south section of the intersection of Xingfu South Road and Youyi Street (Xingnan No.
The South Road of the intersection of Qingyuan Road and G110 National Highway in Qingshan District will be constructed for the laying of heat supply pipeline.
From October 3 to October 12, partial closed traffic control measures will be taken for the south section of the above road.
From October 3 to October 18, partial closed traffic control measures will be taken for the east section of the above road.
The construction of heating and gas supply project will be carried out for the road 150m east of the intersection of Lingyun road and Jingming road in Jiuyuan District.
From October 2 to October 21, phased and fully closed traffic control measures will be taken for the non motorized lanes of the above sections of roads.
1 neighborhood) in rare earth high tech Zone will carry out the construction of sewage pipeline emergency repair project.
The traffic security administration bureau of Baotou Public Security Bureau reminds the vehicles and pedestrians passing through these construction sections to pay attention to the traffic signs, obey the command of the on-site traffic police and traffic facilitators, and choose an appropriate route.
Specific sections include: the emergency repair project of heating pipe network will be carried out for the section of Xingfu South Road (iron and Steel Street science Road) in Qingshan District.
The road is closed from 22:00 at night to 6:00 the next day, and normal traffic will resume after 6:00.
Half closed traffic control measures will be taken for the above sections of roads from October 2 to October 7.
Partial closed traffic control measures will be taken for the above sections from October 3 to October 6.
The construction of heat supply pipeline laying project will be carried out for the section of Refractory Factory Road (Bayantala street to be built Weier Road) in Donghe District.
The Yellow River Cloud app is good-looking and easy to exchange gift points for tomorrow’s gifts: aoyi yoga mat and botanical disposable facial washcloth source: Baotou traffic police (responsible editor: Xiaomu) light up to let more people know ↓↓↓..
The traffic and public security administration of Baotou Public Security Bureau issued a notice that road construction will be carried out on some sections of the city from October 2, during which traffic control measures will be taken.