5 after the base course is treated, the coating shall be applied In case of hollowing, sanding or cracking of the base course, the base course shall be treated firmly, fully dried, and then painted, otherwise the waterproof quality and service life will be affected.
If the closed water test is qualified, the protective layer shall be made on the ground first.
Once the water is closed at this time, the waterproof is equal to white.
Even if the closed water test does not leak, if the coating is too thin, it can not be used; Specification requirements: the coating thickness of ground waterproof layer shall reach 1.5mm.
Ten precautions for coating waterproof construction 1.
7 do not add other substances into the waterproof coating at will The proportion of waterproof coating is strictly tested.
After the installation of sanitary ware or the cement of ceramic tile is fully hardened, try to do another water storage test in order to check whether there is secondary damage to the waterproof layer during the paving process.
In addition, long-term exposure will also reduce the service life of the coating.
Therefore, before the roughing layer is applied with waterproof paint, the burr shall be leveled first, and it is better not to stab the hand.
After the construction of waterproof coating, a protective layer shall be made to avoid damage to the waterproof layer caused by later construction There is no protective layer on the surface of waterproof coating, which will be damaged by cross construction in the later stage, resulting in the failure of waterproof layer.
Internal corners and pipe orifices are important waterproof nodes.
Waterproof coating series products of Jinshuai company ↑ Jinshui waterproof supermarket covers SBS, self-adhesive, high polymer polyethylene polypropylene (polyester) fiber waterproof coiled materials, waterproof coatings, waterproof accessories and other products, basically realizing the full satisfaction of products and full coverage of functions.
The base course shall be wetted before waterproof brushing The base water absorbs strongly, absorbs the emulsion composition in the waterproof coating, causes the dry solid waterproof layer easy to appear the powder, the intensity, the needle eye and so on flaw.
Even if it is coated with waterproof coating, it is also the weakest place on the burr tip of roughening; Many families do not level the roughening layer of the original wall before applying waterproof, and directly apply waterproof on the burr.
Closed water test shall be conducted after the waterproof layer is cured When the waterproof coating is not cured, the waterproof layer is still in reaction.
The one-time brushing is too thick.
8 the newly made plumbing on the ground shall be laid on the waterproof layer It is suggested to lay the newly made water pipe and heating pipe on the waterproof layer.
It is recommended to fully spray water for wetting, and some base surfaces even need to be coated.
The brushing times and thickness of waterproof coating shall meet the design requirements The coating construction should not only have the requirements on the number of times and the direction of cross brushing, but also the thickness of each time is very important.
If they are not plastered with rounded corners, stress concentration is easy to form, resulting in cracking of waterproof layer and water leakage.
Putting clean water for closed water test will damage the waterproof layer and easily cause the waterproof layer to shell and fall off.
(some articles come from the Internet) thank you for reading this article 11 patiently-.
6.
After the surface is dry and solid and the film is formed, the internal coating has not been completely dry and solid.
Double Head Lifting Pin Anchor
9.
After the previous one is completely dry, brush the next one again.
In case of leakage, it will not affect other residents.
If the burr is broken, the position is a small hole.
If the coating is directly poured on the ground and applied casually in order to save trouble, each part is thick and thin, and the drying speed must be different.
10.
When there is open water in the base course, it is not allowed to apply waterproof coating directly When the base is clear water, it will dilute the waterproof coating, resulting in uneven emulsion, changing the ratio, and forming a whitening surface.
4.
Especially in the internal corner, it is easy to pile materials and cause the above problems.
3.
Jinshuai waterproof supermarket can meet the needs of various waterproof schemes, use high-quality products and serve high-quality projects.
With the volatilization of water vapor, it will cause blistering and even cracking.
Adding water and other substances changes the product proportion, the quality cannot be guaranteed, and the waterproof effect is reduced.
If there is an empty drum in the roughing layer, the empty drum part shall be removed first.
The coating construction must be brushed again and again according to the process requirements.
The surface of the thick part is dry and the lower part is still paste.
2.
Do not paint directly on the roughening layer In this way, there are hidden dangers in brushing.
The base pipe orifice, internal corner and other parts shall be plastered into circular arc angle Rounding the internal and external corners is an important step to avoid potential waterproof hazards, because the sharper the edges and corners, the more fragile the waterproof, and the more prone to problems.