It is hereby announced that the traffic police detachment of Jieyang Public Security Bureau came on September 30, 2021.
The scope and mode of traffic control 1.
3、 Precautions during traffic control, please drive the passing vehicles in accordance with the provisions of this announcement and the road signs and markings, and obey the command of the traffic police and the safety personnel of the on-site construction unit.
It is recommended to select from previous periods and click the following link to read: Puning public security held a special exchange Symposium on public security police media, and Jieyang exposed a batch of proposals of dishonest Executees@ Jieyang people, start with me and surf the Internet in a civilized way! Remind! Traffic control will be implemented on these sections of Jieyang from October 8! Puning “motorcycle power” traffic illegal rectification, (September 30) exposure! THE.
The area at the upper and lower bridge 64# abutments on the South Bank of Jieyang bridge shall be closed by two-way lanes, with one lane reserved for normal traffic in both directions.
The area at the abutment of ramp a of the lower bridge on the North Bank of Jieyang bridge shall be closed by lanes, Reserve one lane for normal traffic.
2.
2、 The traffic control time is from October 8, 2021 to November 8, 2021.
(the owner) entrusts Zhongjiao road and Bridge Construction Co., Ltd.
Source: Jieyang daily thanks the original author for his creation.
In order to ensure the smooth construction of the project and the safety and order of road traffic, According to Article 39 of the road traffic safety law of the people’s Republic of China, the traffic police detachment of Jieyang Public Security Bureau has decided to implement traffic control during the construction of this section.
Notice on the implementation of traffic control during the construction of part of the pavement of Jieyang bridge Jieyang urban investment and Construction Group Co., Ltd.
(the construction unit) to carry out the construction of part of the pavement of Jieyang bridge.
The construction period will be postponed without further announcement.
If there is infringement, please contact and delete it immediately.
Fixing Socket Cross Hole Nail Plate
Pay attention to Puning Chaoren exchange and read the selected information! ▼ Click To Watch Video ↓ ↓ ↓ original title: attention, drivers! Traffic control will be implemented on part of the pavement of Jieyang bridge.
The relevant matters are hereby announced as follows: 1.
Commonweal sharing.