Review and summary in September and summary of temporary construction management

If we have a plan and do it according to the established objectives, it will be much better.

It depends on your ability whether you can get it or not; The slow distribution of materials in the mixing plant and the low efficiency lead to the idling of workers.

I don’t know where to start.

These are not drawings.

Fixing Socket Waved End Nail Plate

In the whole process of temporary construction management, I feel that I am not even as good as a construction worker, because the personnel, machinery, construction organization and other aspects are not satisfactory.

It’s difficult to start before I do it.

If I do it again, it should be much better.

They do not make full use of the subcontracting teams and groups and will not use their strength.

As for the ways and means to urge the materials, it depends on your methods; There are no construction drawings for temporary buildings, only one layout diagram, no elevation, some basic dimensions but no specific practices, specific practices of drainage ditches, bench grading and embedded hydropower pipelines.

It’s simple to say, but when you actually control and coordinate, all kinds of things come out.

If the temporary construction cannot be organized, how to control the construction of large projects in the future? Now that you have this opportunity to be small and then big, of course, you should seize the opportunity to exercise yourself.

Therefore, for the summary and review in September, it’s better to write about some achievements of temporary construction before.

To be exact, I’m so busy that when I want to review what I did and what I gained in September, I can’t remember what I did.

I didn’t think of making a progress plan and drawing a bar chart to set the progress.

The truck crane is not empty.

Being busy leads to the failure of my reading plan and running plan in September.

Temporary construction is actually very simple.

However, if temporary buildings have been built once, these can be determined on site.

Many things on the site should set the general direction, rather than implementing the use of talents and machines every day.

I think my engineering department just works according to the drawings.

They are a little timid.

The gap between experienced and inexperienced is here.

Instead, it seems that you don’t have the ability and the pattern is small, so you discuss with the team on the spot what to do.

On the one hand, I really have no experience, on the other hand, I am too idealistic and take everything for granted, Many of the actual situation at the scene did not consider it thoroughly, so they didn’t deserve it.

This is a very big disadvantage.

The fourth problem is the lack of coordination.

If I really experience it once and look back, I will feel that it’s just so.

I’ve been a little busy recently.

On the other hand, I also want to give myself an opportunity to exercise and grow up, but really, the pattern is small.

This can really exercise my organization and coordination ability, but the pattern is really small.

There are three teams involved: Civil Engineering, hydropower and plank house erection, bulk materials are concrete, and large machinery are excavators, truck cranes, muck trucks and road rollers.

You have to compete with others.

2 first of all, it is the problem of insufficient work experience.

They arrange many things themselves and make mistakes in their positioning.

Although I learned a lot, I’m really a little busy.

You are also welcome to criticize and correct.

On the site, I thought about what I had done today and what I would do tomorrow, but I didn’t make the overall planning and layout of the whole project.

Of course, I’m not self disciplined enough.

In fact, everything is like this.

There is no sense of direction.

You have to urge the materials.

On the one hand, it is due to the sense of responsibility.

It moves without planning.

At least I am not satisfied.

There is no plan at the beginning.

They were very flustered.

come on.

‍‍‍‍。.

The second is that there is no holistic view and overall view.

Fortunately, now I have experienced the construction management of temporary buildings.

Fortunately, I’ve always made a construction daily, and the work can be traced back.

This should not be the case.

In addition, I recently changed a new project and began to make preliminary preparations.

I can only say that my ability is not enough.

I want to tell myself a lot of things and feel uneasy about giving them to others.

I am the Minister of engineering, not the chief of the building, not the construction worker.

But on second thought, this shirking of responsibility can’t make you gain anything.

The third is that the pattern is small, and things are not atmospheric enough.

I hope that from this temporary construction, to the construction management of the full commencement of large and medium-sized projects, to the whole process management of large-scale projects, to the whole career planning and life management, we can get better and better, and move forward a little towards our expected goal.

There is no plan for each node.

In doing anything in the future, we should first determine the overall idea, and then improve the relevant details.

/This is the 687th original article of civil engineering Xiaosheng / 1 Hello, I’m civil engineering Xiaosheng.

In fact, there are some complaints in this regard.

In fact, I can throw the pot to the technology department.

It is done blindly.

There is no plan and no drawings, but it urges me to make progress every day.

I was pushed by the work every day, but didn’t give full play to my master’s initiative.