What data does the construction unit need to report to the supervisor for inspection?

Application for construction inspection of subdivisional / divisional works (A4): attach construction records, tests, quality inspection forms, etc.

General project schedule and phase I construction schedule, and dynamic table of work, materials and machinery.

Engineering Survey (A4): Engineering positioning, foundation trench line inspection, floor plane setting out, floor elevation copying, verticality measurement, etc.

2、 Construction process inspection application data 1.

The Contractor shall provide re inspection qualified data for the main construction materials.

Work contact list (C1), engineering change order (C2), etc.

Project subcontracting report for approval (A3).

4.

Progress payment (A5), change fee, claim fee (A8), etc.

5.

Personnel of special types of work: winch, electric welding, test, measurement, tile inspection, electrical and other work certificates.

10.

Monthly construction schedule, dynamic table of work, materials and machines.

6.

6.

5.

8.

The text is as follows: I.

materials to be submitted for approval before commencement 1.

                                                        ×××× Construction Supervision Co., Ltd                                                         ×××× Supervision department                                                         ××××                  。.

13.

2.

Construction organization design and construction scheme (A1).

9.

Reply to supervision notice (A6).

7.

Project delay submission for approval (A7).

Provide drawing review records and check construction technology (safety) disclosure records.

12.

4.

8.

11.

Application for mobilization inspection of engineering materials (A9): mobilization inspection and test records, three certificates, retest report, etc.

3、 Completion data 1, as built drawing 2, quality inspection data of unit project, completion report (A10), warranty, etc.

3.

Witness sampling and inspection records.

The laboratory shall issue the mix proportion notice of concrete and mortar.

Project commencement report (A1).

shall be submitted for review.

Laboratory: commission contract, qualification certificate and post certificate of tester.

3.

Construction survey retest record (A2).

Contractor’s certificate: qualification, business license, safety qualification, etc.

Cuplock System Scaffolding

2.

Management personnel of the project department: Project Manager, technical director, quality inspector, safety officer and other certificates.

Inspection certificates of various measuring and measuring instruments and instruments (theodolite, level gauge, scale, steel ruler, tile detector, pullout meter, air meter, etc.).

7.

The main construction materials (steel, cement, brick, anchor rod, admixture, gravel, sand, components and fittings, equipment, waterproof materials, decorative materials, etc.) shall be issued with “three certificates” and manufacturer qualification certificates.