Work dynamics of weekly construction of Yuncheng Power Transmission and transformation branch

On the one hand, arrange the personnel on duty to continuously inspect the completed tower to prevent foundation sinking and quality problems caused by continuous rain.

Cast in Sockets

Copy of team 2 of line construction line of power transmission and transformation branch | director    Editor Bo Guo Ruitong October 11, 2021..

4、 The Party member activity room of the new project Department of Zhaidian 220kV substation organized the activity of “respect heroes, learn models, and the general secretary stressed the need to learn from the good”.

  NATIONALDAY   During the national day of Shanxi Yuncheng Zhaidian 220kV power transmission and transformation line project in early October, the weather continued to rain, the construction site was inaccessible, and all staff entered the rest period; The construction project department shall carry out the verification of flood control materials in rainy season and the continuous investigation of hidden dangers in the team’s resident houses, so as to ensure the adequacy of flood control materials and the safety of on-site personnel on duty, and strictly prevent accidents.

3、 Tian bin, director of the Ministry of construction of the provincial company, and Yan Jie, director, publicized and implemented the safety theme activity plan of “ensuring safety and comparing effectiveness”.

5、 Shanxi Yuncheng Zhaidian 220kV line construction project department checked the flood control material reserve.

2、 Tian bin, director of the Construction Department of the provincial company, and Yan Jie, director of the construction department, conducted on-site inspection and guided the standardized construction layout of Shanxi Yuncheng Zhaidian 220kV power transmission and transformation project department.

6、 Shanxi Yuncheng Zhaidian 220kV line construction project department inspected the site and assembled the completed iron tower.

Tian bin, director of the Construction Department of the provincial company, Yan Jie, went to Shanxi Yuncheng Zhaidian 220kV power transmission and transformation project for inspection during the national day, and presided over the “October site regular meeting of Shanxi Yuncheng Zhaidian power transmission and transformation electrician project safety day” held by Li wangzeng, vice president of Yuncheng Power Supply Branch, Wang Yong, director of construction management center, Shi Zhefeng, deputy manager of Yunneng power transmission and transformation company, and Qiu Zhigang, deputy manager, accompanied the inspection.

The following are some work trends of on-site construction from September 27 to October 10 (the 21st week): I.

Tian bin, director of the provincial Ministry of construction, Yan Jie, director, Li wangzeng, deputy general manager of the company, Wang Yong, director of the construction management center, Qiu Zhigang and Shi Zhefeng, deputy managers of the company attended the activity.