50 when the protective facilities such as hole cover rail are removed due to work needs, no obvious signs are set and the temporary safety fence is not restored in time.
84 temporary stay wires use trees, rocks, towers, etc.
Materials and tools are stacked within 0.8m from the edge of the foundation pit mouth 77.
83 there are people inside the stressed steel wire rope.
82 when the tower is assembled and erected, they do not connect the grounding wire in time.
81 high altitude operators go up and down the tower along the tower body components.
Operators outside the foundation pit throw materials and tools into the pit 75.
Engaging in high-altitude operation without using high-altitude fall prevention articles or devices such as safety belt 5.
1.
The safety isolation between the construction area and the operation area of 100 reconstruction and expansion project is not standardized..
9 high altitude operation is carried out in thunderstorm weather.
The female worker’s long hair does not put in the safety helmet 3.
8 no tool bag is used for high-altitude operation.
85 stand under the suspended tower.
Tools, instruments, materials and other objects are thrown at random.
10 water operation is carried out without life-saving equipment.
80 use the tower material as a temporary holding pole.
Wearing high heels, sandals, slippers, skirts, shorts and vests to enter the construction site 4.
53 the equipment is thrown temporarily for a long time and placed arbitrarily without wire rope insurance, Blocked passageway 55 the construction site is dirty, disorderly and poor, and the “materials are exhausted and the site is cleared” is not achieved.
as stressed anchor piles.
Entering the operation site without wearing safety helmet 2.
The operation platform for suspended operation of foundation pit construction is not stable and has no edge protection 78 when working in forest areas, When using open flame 79 for tower assembly and erection at will, the steel wire rope is in direct contact with the lifting parts.
91 the access road is not provided with traffic signs or speed limit boards, Or non-standard 92 cable trench construction without fence and warning signs 93 scaffold operation layer without scaffold board Not fully paved or not fixed 94 the horizontal rod probe below 2m of the scaffold is too long 95 climb up and down the scaffold along the cross bar or vertical pole 96 the ladder foot has no anti-skid device 97 the herringbone ladder has no anti opening pull rope 98 the lead length between the mobile switch box and the fixed distribution box for construction in the station is greater than 40m 99 when using the elevated truck body for operation, The operation bay door is not fastened or the safety device is not locked.
11 scaffold and crossing frame are directly put into use without acceptance after erection.
86 the traction rope is seriously worn, deformed When the rusted and burned steel wire rope 87 highway crossing frame has unlimited height, speed limit and reflective signs 88 to cross the uninterrupted line, when the operators climb on the inner side of the crossing frame or pass 89 from the capping frame to erect and dismantle the crossing frame of important facilities, there is no safety supervisor to supervise 90.
12 when lifting heavy objects, 13 people are under the lifting parts, No command or commander without certificate 14 hoisting operation without safety warning board and safety fence 15 hoisting operation near the live line is not safe enough and no effective measures are taken 16 material U-ring is used instead of tool U-ring 17 card unloading (U-ring) transverse stress 18 hoisting machinery without braking and check device or braking device failure Insensitive 19 lifting equipment and appliances without allowable load mark 20 chain hoist overloaded use 21 safety distance between oxygen cylinder and acetylene cylinder ignored during gas welding operation (5m) 22 oxygen cylinder and acetylene cylinder exposed to the sun 23 no special labor protection articles were used for welding or cutting operation 24 grinder was used without protective glasses and the operation standing direction was wrong 25 drilling machine was used Wear gloves when sledgehammer 26 use class 1 hand-held electric tools without insulating gloves or insulating shoes 27 foundation concrete tamping personnel are not equipped with insulating gloves and insulating rubber shoes 28 take off insulating protective appliances during live line operation 29 wet hand operation of electrical appliances 30 belt adjustment or lubrication during mechanical operation 31 no protective cover for rotating parts of mechanical equipment 32 use safety tools and instruments beyond the test cycle 33 construction machinery There is no corresponding safety operation card 34 the concrete mixer is not provided with a protective shed 35 it is forbidden to dig tools into the drum during the operation of the mixer 36 the distribution box and switch box are not inspected and repaired for a long time 37 the door of the distribution box is unlocked No warning signs 38 use copper wire or other wires and fuse wires that do not meet the specifications 39 use winding method for grounding 40 when installing grounding wire, the grounding electrode is not inserted into the ground at a depth of less than 0.6m 41 construction power line is exposed 42 temporary power supply has no leakage protector 43 hot work is not handled according to regulations or action ticket 44 welding is carried out above inflammables or important equipment, and there is no supervisor below to take preventive measures Fire and other safety measures 45 the construction site is not equipped with fire-fighting equipment as required 46 when the electrical equipment is on fire, the direct fire-fighting with water or improper disposal measures 47 use steel tape to measure around the live equipment 48 holes have no cover plate or the cover plate is not standard 49 deep ditch There is no safety warning belt or fence around the deep pit.
7 no physical examination is carried out for high-altitude operators.
Hanging the safety belt on moving or unstable objects or low hanging high 6 upper and lower frames No climbing self-locking device is used for the tower.
The remaining soil near the foundation pit mouth is not cleaned 76.
56 drunk driving, driving without license Speeding or overloading 57 mixed loading of passengers and cargo58 temporarily rented truck crane without relevant certificates 59 full-time safety officer failed to stop violations in time 60 work principal allowed staff to work before all safety measures listed in the work ticket were implemented 61 did not conduct on-site investigation as required or the investigation was not serious No survey record 62 safety regulations examination by others 63 new workers arranged work for construction without three-level safety education and training 64 construction teams did not make safety disclosure, Arrange constructors to start work 65 do not handle accident insurance for personnel engaged in dangerous operations 66 the project department privately recruited labor subcontracting team 67 did not formulate rectification plans for the identified potential safety hazards and implement them 68 concealed and delayed reports in case of personal casualty accidents 69 borrowed or used linked means to participate in project subcontracting and labor subcontracting 70 subcontracted projects did not sign safety agreements according to law, The safety responsibilities to be borne by both parties are not specified 71 there is no safety supervisor at the pit side during excavation 72 when earthwork is excavated, Constructors rest in the foundation pit 73 When the depth of the foundation pit exceeds 1.5m, the ladder is not used for blasting operation up and down the pit 74.
52 the operators expand the work scope, work content or change the set safety measures without authorization.
When the crossing frame is dismantled, it is dismantled up and down at the same time or the frame is pushed down as a whole.
51 crossing (or drilling) is not restored in time.