24.
28.
Strengthen production management and solve practical problems in the construction process in time to speed up the construction progress.
25.
Reasonably arrange earthwork excavation procedures.
11.
The way to reduce the cost of construction projects should be both open source and throttling, or increasing income and saving expenditure.
For the procurement of materials and equipment, compare three suppliers, finally determine the supplier, and strive for the direct supply of batch materials by the manufacturer, so as to reduce the intermediate circulation links and reduce the cost of material procurement.
Reasonably organize construction.
Do a good job in material measurement, clean up, reasonably recycle and reduce raw material consumption.
Pay attention to the completion and delivery of the project to ensure that the benefits can be brought into play as soon as possible.
After the completion of the project, the project settlement data shall be taken out as soon as possible, so as to achieve the completion of work, site clearing and account clearing, so as to reflect the benefits of the enterprise in time, ensure the normal return of funds, speed up the turnover of funds and reduce financial costs.
The incoming materials, finished products and semi-finished products shall be stacked according to the site layout to be reasonable and tidy, so as to reduce the secondary handling loss.
27.
Do a good job in the mobilization acceptance of materials, inspect the quality and quantity, and reduce the mobilization loss.
The materials and equipment entering the site shall be stacked in the open air to reduce the time, prevent the loss of natural loss and reduce the storage cost.
16.
Grasp all links of material handling, transportation and management to reduce material consumption.
30.
Reduce the cost of raw materials…
5.
During construction, materials shall be collected in limited quantity and used reasonably to reduce material loss.
Try to complete the quality acceptance at the place of origin of raw materials or semi-finished products to reduce the scrap rate of materials.
Strengthen the management, maintenance and repair of mechanical equipment and improve the utilization rate of machinery.
During the construction process, actively promote new construction methods and means such as new processes, new materials and new machines and tools, so as to improve construction efficiency, reduce project cost, pay attention to technical innovation and rationalization suggestions, so as to ensure the realization of project quality, progress and cost objectives.
Early strength agent shall be added to the concrete to shorten the formwork erection time and speed up the formwork turnover.
29.
30 effective measures to reduce costs 1.
Fully grasp the joint review of drawings, combine the design scheme with reality, reduce the cost and facilitate the construction.
After cutting, the plates shall be arranged at the place of origin and transported to the construction site after passing the acceptance.
14.
On the premise of ensuring safety, reducing the earthwork grading of foundation trench can reduce the earthwork volume, so as to save labor cost and machine shift cost.
Strengthen the site general layout management.
Bulk cement is adopted to save packaging cost.
3.
Allocate earthwork excavation and backfilling to save project cost.
In the construction arrangement, corresponding measures should be taken as soon as possible, so as to cooperate and process while there are installation conditions, and pay close attention to the construction when there are installation conditions, so as to disperse the workload in the peak construction period, reduce the pressure on the installation work in the later stage of the project and achieve balanced construction.
12.
Strengthen the control and management of process product quality, ensure that the products are excellent at one time, reduce rework and other phenomena, ensure the progress with quality and reduce the cost with quality.
Prepare scientific and reasonable construction plan.
8.
Select advanced and reasonable construction technology and methods, make full use of the construction site, expand the mixing working face, improve the mixing processing efficiency and reduce the project cost.
Earnestly implement various quality systems.
23.
It is required to control expenditure with budget income, conduct cost accounting and formulate target cost.
Strengthen contract management and reduce contract risks.
During the construction process, the project department shall ensure the effective operation of the quality system according to the requirements of the company’s quality manual and procedure documents, strictly control all quality inspections, strengthen supervision and inspection on key parts such as toilets and concealed works, eliminate potential quality hazards in the bud and avoid the loss of rectification and rework caused by quality problems.
If granite is purchased, the base metal must be selected from the mine.
Strengthen formwork management, do a good job in formwork removal and maintenance, and increase the turnover times.
On the premise of meeting the construction progress, the project department shall scientifically prepare monthly and quarterly material requisition plans; Strengthen the on-site material management, ensure that the material plan is accurate, and organize the materials of different varieties and specifications to enter the site in batches according to the needs of the project progress.
The labor force shall be allocated according to the needs of the project progress, a more thorough responsibility contracting method shall be adopted for the construction team, the salary distribution shall be linked with the completed project, and one specialty and multiple abilities shall be advocated to reduce intermittent idling and non production employment.
7.
Reduce material procurement cost.
4.
18.
Implement cost veto.
The project department shall timely prepare the divisional construction schedule of installation works according to the general schedule of the project, make full use of cross construction, flow operation and other means, scientifically arrange and strictly implement various elements of construction, reduce idling, shutdown and other phenomena, and improve labor productivity.
10.
The use of double mixing technology in concrete can not only reduce the cost, but also improve the workability of concrete (mortar) and improve the quality of concrete.
Carry out cost back calculation according to the target cost, and determine the control range of material consumption of each divisional and subdivisional project and the control range of each type of work.
Improve the plan management level, grasp the plan preparation, comprehensively balance and check the implementation links.
26.
Construction machines and tools shall be reasonably equipped, and construction machinery with high efficiency shall be selected to improve productivity and mechanized construction level.
2.
19.
The following discusses the ways and measures to reduce the cost of construction projects from the perspective of increasing income and reducing expenditure.
Strictly open the template to reduce rework and cost.
17.
Strengthen the dispatch and management of labor force.
For the installation project, in the early stage of the project, the construction cooperation period is long, the labor consumption is large, and in the later stage, the quantities are concentrated, the construction period is tight and the pressure is high.
15.
6.
20.
9.
13.
It is impossible to reduce the cost only by opening source without throttling or only throttling without opening source, at least it will not have the ideal effect.
Strengthen the cost management of engineering projects, prepare engineering cost control plans, increase revenue and reduce expenditure, conduct cost analysis regularly, and take measures to reduce expenses and increase profits.
22.
21.