90 “water, electricity, wood tile oil” construction standards, novices must see, it is difficult for decoration workers to perfunctory you

The gypsum board shall have a 3mm joint with the wall for crack prevention treatment.

Rust prevention treatment shall be carried out for the paint on the metal surface.

We should try not to let carpenters do the furniture.

48.

Click to pay attention not to get lost, create a healthy, safe and environmentally friendly home, let the decoration leave no regrets, and let the decoration become a happy thing.

64.

22.

62.

Socket duoyishan 25.

12.

16.

71.

15.

46 When the wall tile touches the pipe opening, it should be cut in the form of sleeve cutting, so it still looks like a whole brick.

89 After the skirting line is installed, the joint shall be repaired with putty and emulsion paint.

It is not only good-looking.

84.

10.

Good cassette shall be used.

83.

The next paint construction must be carried out after the previous paint is completely dry.

37.

It is better to lay grid cloth where there are cracks on the wall 77.

The left zero and right phases shall be grounded.

Cement of different varieties and grades cannot be mixed.

13 Cement should not be used for toilet installation.

47.

Gun nails shall not be used.

60.

The faucet and basin should be matched, so it can’t be installed if it’s not done well.

17.

Consider whether the washing machine should drain up or down.

68.

The carpentry is not well done and the design is not good.

The cross-sectional area of the wire in the PVC wire pipe shall not exceed 40% of the cross-sectional area of the wire pipe.

49.

They should be soaked in water for more than two hours and can be pasted after drying in the shade.

The switch shall not be installed behind the door.

The floor tiles in the bathroom should be inclined to the floor drain, otherwise it is easy to accumulate water.

44.

7.

Bandage 76 should be applied at the joints of gypsum board 76.

IV.

The instructions, warranty cards and other materials must be kept.

The purchased electrical appliances must be well read by the workers.

Yuba should be installed on the keel, not directly on the ceiling.

32.

86.

50.

Strong and weak current shall not be penetrated in the same pipe.

Large wood boards should be sawn and dried after they are bought 57.

3.

Do not mix water during the construction of medium and dark emulsion paint as much as possible, otherwise it is easy to have color difference 75.

Water pipes should not walk from the ground as far as possible.

45.

paint engineering 74.

The external corner should be cut with a 45 ° angle.

The size of the mirror in the toilet should be considered first, otherwise the front lamp of the mirror is easy to be installed high.

Check valves should be installed in the public flue.

40.

Glazed wall tiles and floor tiles have high water absorption.

River sand must be used instead of sea sand, Taste the taste with your mouth.

88.

24.

63.

82.

It is difficult to clean matte tiles.

The weather is too cold, The paint construction quality will be poor.

14.

18.

Consider the pit distance of the toilet when buying the toilet.

Be sure to ensure that the workers construct according to the drawing 73.

31.

26.

The main lights in the living room and bedroom shall be double controlled as far as possible.

81.

27.

The frosted glass shall be protected with newspaper.

The switch shall be 1.4m.

II.

We must not let them make their own decisions.

35.

wood works 52.

65 We must communicate with the foreman more about the carpentry work that we can’t eat.

The cassette must be matched with the panel, Otherwise, it may not be installed.

The flatness of floor wooden dragon bone is 5mm v.

The air conditioner hole shall be inclined outward, otherwise the rain will come in.

The cold water pipe should have a 1cm protective layer in the wall, and the hot water pipe is 1.5cm, so the groove should be opened deeply.

The floor keel should preferably be made of dried Larch 53 Ceiling fans should not be installed on the ceiling keel 54.

The balcony floor tile should pay attention to the drainage direction.

It is best to remove some putty on the original wall, Or brush one coat of glue for sealing 78.

Waterproof works should be done after the construction and acceptance of concealed works.

30.

Carpenters should snap the horizontal line of the house before entering the site 55.

23.

Water storage test should be done twice after waterproof construction.

5.

Cement cannot be used three months after the delivery date.

29.

79.

The upper and lower risers of wooden doors shall be painted once for protection.

It is too hot, pay attention to ventilation.

The power socket shall be 300mm from the ground.

The bright and mercerized emulsion paint should be completed at one time, which is prone to color difference.

It is difficult for decoration workers to perfunctory you.

If the bathroom is small, we should try to move the door, Do not open the door and occupy the place 72.

69.

Bend Loop

39.

The cabinet shall be bought as a whole as far as possible.

43.

Pay attention to protection after the toilet and faucet are installed.

The air conditioner in the bedroom shall not face the bed.

Mud works 38.

When pasting wallpaper, remove the panel of switch and socket.

80.

28.

Polish the paint and coating after it is completely dry.

These 90 “water, electricity, wood tile oil” construction standards must be read by friends for the first time.

2.

There can be no two rows of incomplete tiles on one wall.

Gypsum boards should be fixed with countersunk self tapping screws and enter the board surface by 1 ~ 2mm, And anti rust treatment shall be carried out.

The thickness of ceramic tiles should be considered when installing PPR pipe, so that the pipe will not be exposed.

19 A manhole shall be reserved behind the toilet pipe wrapping the riser.

The floor tile must be dirt resistant and anti-skid.

Try to buy the paint of well-known brands.

The hanging bar of the ceiling should not be more than 30056 from the wall.

It is best not to install a telephone in the toilet, which is prone to moisture.

42.

Hinges and hardware must be used well.

The waterproof layer in bathroom shower area should not be less than 1.8m.

Do not brush the paint when the weather is too wet.

Color panels should be painted once they come in to prevent soiling 59.

Hot and cold water pipes are hot on the left and cold on the right.

41.

9.

Try not to use the paint recommended by the decoration company or the foreman.

21.

Protective measures shall be taken for the external corners of gypsum board.

66.

Waterproof should be done once more in floor drains, internal and external corners, pipes and other places.

There are children at home, and glass should be used less.

4.

Electrical Engineering 20.

85.

Cooking only takes a few minutes, washing vegetables takes a long time, and the water bucket must be bought.

It is best to install splash proof socket 33 in the sanitary room, socket 34 on the balcony, and the wire trough shall be horizontal and vertical, Take a good picture and make it easy to use in the future.

Kitchen drawers are very useful.

90.

Wall and floor tiles would rather buy more than less, otherwise it is easy to have color difference.

87.

51.

Film waterproofing should be adopted for waterproof construction.

16A socket for high-power electrical appliances, such as electric oven.

3.

When painting the door, stick the hinge and door lock with textured paper.

8 The floor drain should not save money, but use an odor proof floor drain.

Color should be selected in advance during the construction of color panels 58.

11.

70.

36.

The ground marble should be dry paved more firmly.

67.

Clean the tiles immediately after pointing.

6.

1、 Water works 1.

When pasting wallpaper, brush the base oil on the wall.

The distance between gypsum board nails shall not be greater than 20061.