Bidding for construction supervision of pre station works of Jieyang Huilai railway project

The main line of the newly-built Jieyang Huilai railway is 88.511km long, including 32.199km/32 main line bridges, 26.618km/12 tunnels, 29.684km subgrade and 63.62% bridge tunnel ratio will be built.

The estimated total investment of the project is about 13.278 billion yuan, and the construction period of the project is 4 years.

3.2 each bidder can bid for one or more of the above bid sections.

(2) Jhjl-3: service until the end of the defects liability period.

traction mass: 4000 tons.

For specific operations, see Appendix 2 operation instructions for obtaining bidding documents of the bidding announcement 4.3 the price of each set of bidding documents is RMB 500 / bid section, and the after-sales service is non refundable.

completion acceptance and other contents that should be included in the supervision scope according to the current regulations of the competent department of the railway industry.

1.502km Xinheng connecting line, 1.565km Jieyang connecting line and Dahai will be built The branch line is 3.625 km; the newly-built PetroChina Guangdong petrochemical special line is 5.391 km, with a total of 12.083 km (single line).

The tenderee is Guangdong jiehui Railway Co., Ltd.

3.1 for the qualification requirements of bidders in this bidding, see the appendix to the bidding announcement.

Traction type: EMU, HX Series Locomotive (freight) .

4.2 bidders who have completed online bidding registration in the business system of Guangzhou public resources trading center can log in to Guoyi bidding procurement platform (hereinafter referred to as “Guoyi platform” website: www.ebidding.

2.3 bid section division: it is divided into two bid sections with bid section numbers of jhjl-2 and jhjl-3 respectively.

Design speed of passenger train: 160 km / h.

8 stations including Jieyang, Linpan, Hongyang, Puning north, Puning, Dananshan, Huilai and Dahai will be built, and 3 line stations including XianMei, Xinheng and Huilai West will be built.

The proportion of contribution is 50% of the project capital and 50% of the bank loan.

the project has met the bidding conditions.

It starts from Jieyang station of Meishan railway, passes through Jiedong District, Jiexi County, Puning City and Huilai County, and finally Huilai station of Shantou Shantou railway is under construction.

566) The construction is approved.

(3) Main technical standard railway grade: class I railway.

Traction type: electric power.

the construction funds come from Guangdong Province, Jieyang City and bank loans.

Jhjl-3: (1) main line works (dk21 + 279 ~ dk56 + 022), Puning freight yard is also built.

2.

Now the post qualification review method is adopted for the construction supervision of pre station works of Jieyang Huilai railway project Conduct public bidding.

2.2 bidding scope: the bidding scope includes Jieyang Huilai railway project (excluding pre station works of section dk56 + 022 ~ dk67 + 195 and special line for Dahai general wharf) Construction supervision of all pre station works within the scope and supervision of relevant civil air defense works, environmental and water conservation and blasting works, as well as assisting the construction unit in preparing for the commencement of the project (including land acquisition, demolition and pipeline relocation) .

(2) Construction scale: the newly-built Jieyang Huilai railway is located in Jieyang City, Guangdong Province.

Xinheng connecting line, Jieyang connecting line, Dahai port connecting line and PetroChina special line are built simultaneously.

4.4 The bidder shall handle the enterprise information registration in Guangzhou public resources trading center before bidding registration.

Qualification requirements of bidders.

Number of main lines: single track, double track reserved for Jieyang Puning section.

The main works of the bidding include: demolition works (including road relocation, tree cutting and stumping, ditch and channel reconstruction, sound insulation window, river channel and other non local lump sum works, temporary land, three electricity and pipeline relocation in the road, etc.) Supervision of, subgrade, bridge, tunnel, track and other works.

completion acceptance and other contents that should be included in the supervision scope according to the current regulations of the competent department of the railway industry.

Block type: automatic inter station block.

Bidding announcement for construction supervision of pre station works of Jieyang Huilai railway project bidding announcement for construction supervision of pre station works of Jieyang Huilai railway project bidding No.: yx21a10n02041.

Com) to obtain bidding documents.

Flat End Socket Cross Pin

Among them, jhjl-2: main line project (dk0 + 000 ~ dk21 + 279), Xinheng connecting line (including Xinheng station) (ldk0 + 000 ~ ldk01 + 502.44), Jieyang vertical fold line (lzdk0 + 000 ~ lzdk1 + 564.98) All pre station works within the bid section, bridge prefabrication works and beam erection works within dk21 + 279 ~ dk56 + 022, track laying construction supervision of the whole line (excluding Puning freight yard) and supervision of relevant civil air defense works, environmental and water conservation and blasting works, as well as assisting the construction unit in making preparations for project commencement (including land acquisition and demolition, pipeline relocation, etc.) .

Acquisition of bidding documents 4.1 those who intend to participate in the bidding shall log in to the website of Guangzhou public resources trading center from 9:30 to 16:00 every day (Beijing time, the same below) from November 15 to November 19, 2021 (except holidays)( http://www.gzggzy.cn ) Business system for online bidding registration.

All pre station works within the bid section (excluding track laying, bridge prefabrication and beam erection works in the range of dk21 + 279 ~ dk56 + 022, excluding track laying in the range of dk67 + 195 ~ dk88 + 868.41, hdk0 + 076.01 ~ hdk3 + 701.26, szdk0 + 000 ~ szdk5 + 390.82 and dk56 + 022 ~ dk67 + 195), as well as supervision of relevant civil air defense works, environmental and water conservation and blasting works, and assist the owner in making preparations for the commencement of the project (including land acquisition and demolition, pipeline relocation, etc.), completion acceptance and other contents that should be included in the supervision scope according to the current regulations of the competent department of the railway industry.

The owner of the project is Guangdong jiehui Railway Co., Ltd.

Project overview and bidding scope 2.1 project overview (1) construction location: Jiedong District, Jiexi County, Puning City and Huilai County.

The main works of the bidding include: demolition works (including non local lump sum projects such as road relocation, ditch and channel reconstruction, sound insulation window, river course, temporary land, three electricity and pipeline relocation, etc.) 2.4 supervision service period: (1) jhjl-2: service until the end of defect liability period.

3.

55), and reply of Guangdong Provincial Department of transportation on the preliminary design of Jieyang Huilai Railway (yjtz [2021] No.

Bidding conditions Jieyang Huilai railway project (project name) of this bidding project has been approved by Guangdong Development and Reform Commission Reply of Guangdong Provincial Development and Reform Commission on the feasibility study report of the new Jieyang Huilai railway project (yfgts [2020] No.

    (2) Main line works (dk67 + 195 ~ dk88 + 868.41), Dahai branch line (including Dahai station) (hdk0 + 076.01 ~ hdk3 + 701.26), PetroChina Guangdong petrochemical special line (szdk0 + 000 ~ szdk5 + 390.82), ballastless track in the first section (dk56 + 022 ~ dk67 + 195).

minimum plane curve radius: 2000 m in general section and 1600 m in difficult section.

The same bidder is allowed to bid for multiple bid sections, but only one bid section can be selected (if individual personnel repeat, it will be regarded as repeated configuration) 4.

See the website of Guangzhou Public Resources Trading Center for details..

Effective length of arrival departure track: 880m.

Limited gradient: 13 ‰.

2.5 other instructions: /.