Construction bidding of Jinhua Jiande high speed railway

Railway grade: Grade I; Number of main lines: double track; Design speed: 120km / h; Minimum curve radius: 1200m in general, 800m in difficulty; Maximum gradient: 9 ‰; Traction type: electric power; Locomotive type: EMU, HXD series; Effective length of arrival departure track: 850m; Block type: automatic block.

(room 611, railway complex building, No.

4.2 the applicant is requested to bring relevant materials to Nanjing Public Resources Trading Center for bidder information registration before the deadline for the sale of Prequalification documents, and log in to the website of Nanjing public resources trading center to confirm the bidding project.

215) The construction is approved.

265 Jiangdong middle road, Jianye District, Nanjing, exit 4 of Olympic sports east station of Metro Line 2) If the application is made by a consortium, the leader of the consortium shall submit the prequalification application document..

Main contents: four electricity project, disaster prevention project, production and living room, four electricity room and other related projects along the whole line.

the planned construction period is 1277 calendar days, the planned commencement date is January 28, 2022, and the planned completion date is July 27, 2025.

2.

See the front page of Nanjing public resources trading platform for details -Service guide – user registration.

Lot No.: jjgtsg v.

jiandetai Jiande station of Lanjiang super major bridge, with a length of 34.6km.

Chapter VI communication, signal, information and disaster monitoring.

Main contents: passenger ticket system of Lanxi East and Dayang stations, passenger service and production control platform, public security management information system, office management information system, generic cabling system, power supply and equipment, house environment monitoring system, access control system and platform intrusion Alarm system, etc.

12) corresponding chapters of comprehensive budget estimate: Chapter I demolition and land acquisition costs, Chapter II subgrade, Chapter III bridge and culvert, Chapter IV tunnel and open cut tunnel (excluding tunnel lighting) Chapter V track.

The scope of bidding is the total price Contracting Bidding for the construction of the new Jinhua Jiande high speed railway (excluding the pre station and related works of section dk0 + 000 ~ dk30 + 017 of jjgtsg I bid section).

and from 14:00 p.m.

Bid section No.: jjgtsg IV.

Interested potential bidders (hereinafter referred to as the applicant) are invited to apply for prequalification.

5.

Crown Foot Anchor

New Jinhua parking lot with 6 parking lines.

4.1 the applicant is requested to sell from 9:00 a.m.

every day from November 17, 2021 to November 21, 2021 (normal sale on legal holidays and public holidays) (Beijing time, the same below), in Coastal Railway Zhejiang Co., Ltd.

490) and the State Railway Group Zhejiang Provincial People’s Government on the preliminary design of the new Jinhua Jiande high-speed railway (TJH [2020] No.

Scope of work: dk0 + 000 ~ dk64 + 547 (including dyk0 + 000 ~ dyk3 + 449 and dyk61 + 200 ~ dyk64 + 848), i.e.

Railway grade: high speed railway; Design speed: 250km / h; Number of main lines: double track; Distance between main lines: 4.6m; Minimum curve radius: 3500m in general, 3000m in difficulty; Maximum gradient: 20 ‰, no more than 30 ‰ under difficult conditions; Effective length of arrival departure track: 650m; Train operation control mode: CTCS-3; Dispatching command mode: centralized dispatching; Minimum running interval: 3min.

Chapter IX other operation and production equipment and buildings (platform wall, comprehensive pipe trench, tunnel structure engineering, station auxiliary engineering), other buildings and equipment (including sound barrier and sound insulation window) Chapter X Large temporary facilities and transition works.

The deadline is 9:30 on November 29, 2021.

Dongxiao ~ Jinhua station ~ Jiande station (including reconstruction of Shanghai Kunming railway from Jinhua to Dongxiao section and supporting works in Jinhua area) Four electricity project, disaster prevention project, production and living room, four electricity room and other related projects.

The prequalification documents are not accepted by mail order.

2.2 scope of bidding: the name of the bidding project is the new Jinhua Jiande high speed railway.

4.

2.3 other notes: /.

Construction scale: the newly-built Jinhua Jiande railway line is led from Jinhua station of the existing Shanghai Kunming railway, passing through Lanxi and Jiande City in the north, outsourcing Hangzhou Huangdao railway to connect to the existing Jiande east station, and the length of the newly-built line is 64.508 km.

Main technical standards: new line of Jinhua Jiande section.

scope of work: Lanxi east station, Dayang station building and related projects.

Scope of work: dk30 + 017 ~ dk64 + 547 (including dyk61 + 200 ~ dyk64 + 848) Station front and related works, i.e.

Project overview and bidding scope 2.1 project overview construction location: Jinhua City in the southwest of Zhejiang Province and Jiande City in Hangzhou.

The construction bidding project has met the legal bidding conditions, and now it is subject to public bidding.

Chapter VII electric power and electric traction power supply.

Main contents: main works in front of the station within dk30 + 017 ~ dk64 + 547, ballastless track works (including fine adjustment of ballastless track and fine adjustment parts of ballastless track, rail pre grinding and scrap iron removal), Lanxi, Jiande beam factory, Lanjiang super major bridge, low tower cable-stayed bridge (large mileage direction) Post station works of girder fabrication and corresponding bridge deck system (including bridge deck waterproof layer and expansion joint) within the scope of Jiande station, sleeper prefabrication plant, OCS foundation within the scope of bid section.

Bid section No.: jjgtsg Ⅲ.

Announcement on prequalification of total price contract for construction of jjgtsg section II ~ V of new Jinhua Jiande high speed railway (announcement on behalf of bidding) prequalification announcement (announcement on behalf of bidding) announcement on prequalification of total price contract for construction of jjgtsg section II ~ V of new Jinhua Jiande high speed railway (announcement on behalf of bidding) prequalification announcement (announcement on behalf of bidding) 1.

Bidding conditions the new Jinhua Jiande high-speed railway of the construction project has been approved by the State Railway Group Zhejiang Provincial People’s Government on the feasibility study report of the new Jinhua Jiande high-speed railway (TFGH [2019] No.

The reconstructed single track length of Jinhua Dongxiao section of the existing Shanghai Kunming railway is 11.928km in total.

Submission of Prequalification documents 5.1 the submission time of Prequalification application documents is from 8:30 on November 29, 2021 to 9:30 on November 29, 2021.

scope of work: Information Engineering of Lanxi East and Dayang stations.

The owner of the project is Jinliwen Railway Co., Ltd., the construction funds have been implemented, the construction drawing design documents are complete, and the tenderee is coastal railway Zhejiang Co., Ltd.

The details are as follows: bid section No.: jjgtsg Ⅱ.

Chapter VIII house.

30), railway capital construction project design estimate (budget) cost quota (gtkf [2017] No.

31) and the announcement of the state Railway Administration on reducing the value-added tax rate of railway project cost standard (gtkf [2019] No.

Acquisition of Prequalification documents.

Reconstruction of Shanghai Kunming Railway in Jinhua Dongxiao section.

to 11:00 p.m.

The location is the north gate of Nanjing Public Resources Trading Center (address: No.

Bid section division: this bidding is proposed to be divided into four bid sections according to the preparation method of railway capital construction project design estimate (budget) (gtkf [2017] No.

Main contents: Lanxi east station, Dayang station building project, platform canopy and pavement Passenger tunnel decoration and parking lot works.

to 16:00 p.m.

401 Cangsong Road, Haishu District, Ningbo City, Zhejiang Province), hold the copies of unit introduction letter, business license and enterprise qualification certificate, the original ID card of the recipient and the copy of ID card (the copy is stamped with the unit seal) to receive the prequalification document free of charge (the bidding project must be confirmed on Nanjing public resources trading center network before receiving) The price of each set of Prequalification documents is 0 yuan and will not be returned after sale.

Chapter XI safety production cost and related contents.

Jinhua, Lanxi East, Dayang, Jiande East and other four stations are set along the line, of which Jinhua station and Jiande east station are connecting stations.