[construction] key points of safety inspection and data inspection on the construction site are worth collecting!

Relevant materials for safety assessment of “three types of personnel”; 7.

9.

The wall is plastered and whitewashed to be firm, stable, clean and beautiful.

On site fire prevention: the floors of woodworking room, canteen, dormitory area and operation area must be equipped with fire-fighting equipment, and smoke and fire prohibition signs must be hung in dangerous places.

Relevant materials for payment of industrial injury insurance and accidental injury insurance; 10.

Enterprise safety production license (original and copy); 2.

Elevator wellhead: a fixed gate grid or two protective fences with a height of no less than 1.2m (one at 60cm and one at 120cm respectively) shall be set up, and a flat net shall be set every 10m in the elevator room.

It is worth paying attention to the whole process of policy, planning, financing, design and construction, and the necessary skills for the abbot of the temple.

Relevant data on management of labor protection articles and prevention and control of occupational diseases; 19.

Emergency rescue plan for work safety accidents of the enterprise and relevant records of drills; 15.

Enterprise safety production management responsibility system; 3.

It is strictly prohibited to urinate anywhere.

Scaffold: it is strictly forbidden to mix steel and wood.

They shall not be exposed to the sun, and acetylene cylinders shall not be placed horizontally.

In addition to two horizontal railings, a safety flat net must be set up under the opening greater than 1m.

Key points of enterprise safety data inspection 1.

The on-site canteen shall comply with the regulations.

Relevant information on the implementation of documents and notices issued by the competent department and formulated by the enterprise; 21.

Living logistics: no one is allowed to live in the project under construction.

It is not allowed to pile soil, materials and machinery within 1m of the pit (groove) ditch edge.

13.

Clothes are not allowed to hang on scaffolds or wires.

Site access: a protective shed shall be set up at the entrance, the shed width shall be greater than the crossing, and the scaffold board shall be fully paved on the top of the shed.

The canteen shall have screen windows, screen doors and screen covers, hang health licenses, health responsibility system, etc.

The guard room shall have a guard system.

The operators shall have a physical examination and health certificate, and the raw and cooked food shall be separated.

When it is more than 2m, two guardrails must be set around, with a height of 1.2m, the spacing between upright posts shall not be greater than 2m, and the upper and lower channels shall be set up stably and non slip.

5.

Dangerous area: dangerous signs such as “no”, “warning” shall be hung in the dangerous area at the site operation point.

Enterprise production accident account and accident related data; 16.

Enterprise safety production inspection materials; 14.

The shed length shall be greater than 3m; Double layer protection shall be set above 24m high, with an interval of no less than 60cm and a shed length of more than 10m.

Teach you the necessary skills for building a good temple.

Reserved openings: openings larger than 25cm are protected with fixed cover plates, and two horizontal railings with a height of no less than 1m are set around openings larger than 50cm.

Urinals are set in high-rise buildings.

10.

Storage of gas cylinders: oxygen cylinders and acetylene cylinders shall be more than 5m apart and 10m away from open fire.

8.

14.

Project license: business license (original and duplicate), enterprise qualification (original and duplicate), safety license (original and duplicate), safety qualification certificate of enterprise legal person, safety leader in charge and enterprise safety director, safety management network diagram, Safety Production assurance system, safety production responsibility system at all levels, and safety production responsibility Certificate (signed level by level until workers) Qualification certificate and employment of full-time safety officer of project department, employment of team safety officer, documents and schemes related to safety production, etc.

3.

The material meets the standard.

If you have any problems in the process of building the temple, please leave a message and ask questions.

Enterprise safety production rules and regulations; 4.

Edge protection: balcony, roof, floor, staircase, unloading platform and other edge facilities shall be provided with two protective railings, one for each 60 cm and 120 cm high, and columns shall be set if the spacing is greater than 2m.

Color profiled steel plate can be used if conditions permit.

6.

The “three treasures” must have production license, product certificate and quality inspection certificate.

Signs of “important construction area, no admittance for idle people” and “safety helmet must be worn on the construction site” are placed at the gate.

Materials or soil shall not be stacked near the wall.

Enterprise safety production operation procedures; 5.

Site floor: implement hard floor with good drainage (the site is hardened, and the main road in the site is not less than 20m, and not less than 5m outside the site) and equipped with flushing platform.

Relevant data of the enterprise on the management of subcontractors and suppliers; 18.

Other relevant information..

Enterprise safety production education, training files and relevant materials; 13.

12.

Material stacking: it shall be stored neatly by category, marked and provided with site plan.

The safety belt should be hung high and used low.

A light box is set on the top of the door, with the name of the enterprise and the name of the project on it.

7.

Construction pit and groove: when the depth of the excavated pit (groove) is more than 1.5m, slope or reliable support must be added.

Mechanical equipment management data; 17.

I.

15.

Site fence: closed with hard materials or brick masonry (the wall height of main urban sections is 2.5m, and the wall height of general sections is 1.8m).

Personal protection: wear safety helmet and fasten safety belt.

List and management of special operation personnel; 8.

2.

Proof of payment of enterprise safety production risk mortgage; 9.

Relevant information on identification, evaluation and control of hazard sources; 20.

Enterprise safety production management leading group, organization setting and staffing; 6.

Site gate: set gate stack and gate.

Click to ask the source: the copyright of Douding construction belongs to the original author.

Flat Rubber Recess Former

Safety production input list and relevant bills; 11.

Special construction scheme approval and expert demonstration data; 12.

If the scaffold is not removed, it is not allowed to dig foundation on the side.

Brick fences shall have wall caps and walls shall have propaganda slogans.

16.

4.

key points of safety inspection on the construction site 1.

Seven pictures and three signs are hung in the door.

11.