Construction Technology | if there is an accident in the affiliated project, will the witness be sentenced? See how these four classic cases

Judgment of relevant responsible person: the investigation team of the State Council found that the accident was a production safety responsibility accident, and 31 people were taken criminal coercive measures.

4.

2.

The falling object impacted the attached cable of the flat bridge connected with the inner side of the cylinder wall, resulting in the overall collapse of the flat bridge.

38 people were given party and government disciplinary sanctions, and 9 people were admonished, informed, criticized and educated.

3.

On September 15, 2017, the State Council seriously dealt with the “11.24” cooling tower construction platform collapse of Jiangxi Fengcheng power plant.

2.

Focus: judgment of on-site project manager and affiliated project manager.

The accident was jokingly called “falling building” by netizens..

2.

Meng Aiguo, the affiliated project manager, was revoked his practice certificate and refused to register for life! Classic case 3 (2019): 11 deaths and 2 injuries caused by falling of construction elevator in Hengshui, Hebei Province! 1.

Accident level and social impact accident level: major safety production accident       Social impact: a major event that alerted the State Council and the capital and spread throughout the country, with a very bad nature.

4.

Case review on November 24, 2016, a particularly serious accident occurred in the collapse of the cooling tower construction platform of Jiangxi Fengcheng Power Plant Phase III expansion project, resulting in 73 deaths and 2 injuries, and a direct economic loss of 101.972 million yuan.

3.

Case review: at about 7:20 a.m.

Knowing that when bidding for the project of Tsinghua affiliated middle school, he has been assigned by the first construction company of construction engineering to work as the project executive manager of Wangjing comprehensive gymnasium project in Chaoyang District, and has not refused to use his project manager qualification to participate in the bidding of Tsinghua affiliated middle school project.

Although the accident happened in the past few years, some people have been chased and sentenced in recent years, and the impact of the accident is very great! During the construction of No.

Jdfz [2018] No.

Conclusion: Wu Zhiguang, the on-site actual executive manager, was sentenced again.

Case review: on December 29, 2014, the stadium under construction at Tsinghua affiliated high school in Haidian District, Beijing collapsed, killing 10 people and wounding 4 others.

Android and iOS user operation are the same.

4.

3.

NOCITCE changed the push rule because of WeChat official account.

and Chuang branch in June 2014, the reinforcement mesh on the upper layer of the foundation slab in the construction foundation pit collapsed on December 29 of the same year due to the illegal construction of the constructors of Anyang Chengcheng construction labor Co., Ltd, As a result, many workers working here were squeezed between the upper and lower layers of reinforcement mesh, resulting in 10 deaths and 4 injuries.

Case review: on June 27, 2009, a 13 storey building collapsed at the construction site of “Lianhua riverside Jingyuan” commercial housing community under construction in Minhang District, Shanghai, killing one worker.

If you don’t want to miss the highlight of this official account, please put the public number of construction technology as the star sign and click “collect”, “look at” and “Zan” at the end of the text, so that each new article will appear in the subscription list at the first time.

After investigation, it is determined that the direct cause of the accident is that the construction unit illegally removed the formwork of section 50 when the concrete strength of section 50 cylinder wall of No.

Accordingly, the court sentenced Yang Zezhong and other 14 defendants to fixed-term imprisonment ranging from 6 to 3 years, and sentenced the defendant Geng Wenbiao to fixed-term imprisonment of 3 years and suspended for 3 years.

Star setting: enter the official account home page, click on the top right corner, click “set star”, and the yellow star can be seen next to the official account.

If the project has a safety accident, will the project manager who “hang up” will be held criminally responsible? Today, I have sorted out several typical “rollover” accidents for you to weigh, reference and weigh! Classic case 1 (2014): floor reinforcement collapse accident of Tsinghua affiliated middle school in Beijing! 1.

7 cooling tower is insufficient, resulting in the loss of formwork support of section 50 cylinder wall concrete, insufficient to bear the upper load, and began to collapse from the weakest place at the bottom, resulting in the continuous collapse of section 50 and above cylinder wall concrete and formwork system.

Accident level and social impact accident level: especially serious production safety accident       Social impact: Super event, alerting the State Council   Spread throughout the country, the nature is very bad.

The key emerald Huating project manager “hung the certificate” in Hengshui Guangxia construction company, and actually failed to perform the duties of the project manager.

1 Meng Aiguo: according to Article 58 of the regulations on the administration of work safety of construction projects, our department has decided to revoke your first-class constructor registration certificate and refuse to register for life.

Conclusion: Yang Zezhong, the actual executive manager on site, has been severely sentenced, the affiliated project manager’s practice certificate has been revoked and will not be registered for life, Not convicted of a criminal offence! Classic case 2 (2016): the “11.24” collapse of Jiangxi Fengcheng power plant was a particularly serious accident! 1.

Hourglass Rebar Cap

on April 25, 2019, a major accident occurred at the construction site of feicuihuating project 1# building in Hengshui City, Hebei Province, in which a construction elevator car (cage) fell, resulting in 11 deaths and 2 injuries, with a direct economic loss of about 18 million yuan.

It was found that during the construction of the gymnasium and dormitory building of Tsinghua affiliated middle school undertaken by Beijing Construction Engineering First Construction Co., Ltd.

Judgment of relevant responsible person: according to relevant facts and evidence, the court found that the defendants Yang Zezhong, Wang Jingli, Wang Yingxiong, Cao Xiaokai, Jing Xin, Zhang Changfeng, Zhang huanliang, Zhao Jinhai, Tian Yongzhi, Li Lei, Li Chengcai, Hao Weimin, Zhang Mingwei, Tian Kejun and Geng Wenbiao violated relevant safety management regulations during production and operation, resulting in major casualties, The circumstances are particularly bad, and their acts have violated the provisions of the criminal law and constitute the crime of major liability accident.

and Chuang branch, were prosecuted to the court for the crime of major liability accident.

In the actual construction process, the labor operation team decides to remove the formwork by itself.

15 people, including Yang Zezhong, project business manager of Tsinghua Affiliated Middle School of Beijing Construction Engineering First Construction Co., Ltd.

Key points: judgment of on-site project manager and affiliated project manager.

Accident level and social impact accident level: major accident social impact: super large event, spread all over the country, and its nature is very bad.

Judgment of relevant responsible persons in the place where the elevator accident occurred: 13 people, including the safety section chief, project manager and project safety officer of the general construction contractor, were taken criminal coercive measures.

//Wechat public account setting prompt///   The official account is official.

Conclusion: it is suggested to revoke the professional qualification certificate, refuse to register for life, and revoke the safety production assessment certificate.

7 cooling tower, in order to complete the construction period target, the construction progress is continuously accelerated, resulting in the reduction of concrete curing time before formwork removal and insufficient development of concrete strength; In the case of sudden temperature drop, no corresponding technical measures were taken to speed up the development of concrete strength; There are serious defects in the construction scheme of barrel wall engineering, and no targeted management and control measures for formwork removal are formulated; The management of test block submission for inspection and formwork removal is out of control.

Accident investigation report: ye Yaodong, project manager of the engineering project of Tsinghua affiliated middle school, has not been on duty for a long time to perform the duties of project manager.

Classic case 4 (2009): the “Lotus Riverside Jingyuan” building under construction in Minhang District, Shanghai fell down! 1.

Beijing Haidian court sentenced the case, and 15 people were sentenced respectively.

Suspected of major liability accident crime, he was criminally detained by the public security organ on May 12, 2019 and approved to be arrested by the procuratorial organ on May 24, 2019.