Construction technology | foundation pit collapse of Yancheng No. 1 project! Three people were prosecuted! The construction workers

Click Set as star, The yellow star Pentagram (Android and iOS user operation) will appear along the official account.

1.

He did not correctly perform his work responsibilities, did not manage the problems such as organizing foundation pit excavation in place without special construction scheme, education and training for operators and safety technical disclosure, and was responsible for leading the accident.

At about 15:00 p.m., Cheng rented a Xinyuan brand 75 excavator to start earthwork excavation.

Direct cause in the process of foundation pit excavation, the construction management personnel command against regulations, and the operators construct blindly and operate at risk, The construction workers have not taken effective safety measures to prevent collapse such as slope protection During the operation (about 3M deep), the earthwork on the south side of the foundation pit collapsed, resulting in the accident.

It is suggested that the public security organ should further file a case for investigation because it is suspected to constitute a crime.

As it is suspected to constitute a crime, it is suggested that the public security organ should further file a case for investigation.

It is suggested that Yancheng Emergency Management Bureau should impose administrative punishment on them.

Shang mouchun was completely buried by the soil, and Xu mouyang was buried to his waist.

Shao Mou, male, 34 years old, safety officer of the subcontractor, who did not correctly perform his duties, participated in the organization and implementation of foundation pit excavation and pipe replacement without special construction scheme and safety technical disclosure by the construction personnel, The safety activities and construction conditions of the construction organization team of Xuehai Road (West Ring Road East trunk canal) well w67-w68 pipeline were not reported to China * Shanghai Airlines, which was mainly responsible for the accident.

At around 17 in June 4, 2021, it was located in the green belt of the south side of the north gate of the Yancheng City high tech Industrial Zone, and the comprehensive control of the water environment in the third flood control area of Yancheng.

At about 15:45 p.m., when the constructor Yang moufei was patrolling other points, he found that team J-10 was using the excavator to excavate earthwork trenches when passing Xuehai road At the same time, he sent a picture of Excavator Construction in the mobile wechat group and reminded the subcontractors Shao and Wu to “learn from the sea road excavator to excavate and greening, and bear the consequences when digging the pipeline”.

Rubber Recess Former

Star setting: enter the official account homepage and click on the top right corner.

2.

Cheng, female, 55, is the head of team J-10 of the labor service company.

3.

It is suggested to investigate the criminal responsible personnel.

Seeing that the workers stopped construction, packed up labor tools and left the scene.

If you do not want to miss the highlight of this official account, please set the public address of the construction technology as the star sign and click “collect”, “look at” and “Zan” at the end of the text, so that each new article will appear in the subscription list at the first time.

1.

As it is suspected to constitute a crime, it is suggested that the public security organ should further file a case for investigation.

(2) It is suggested to give administrative punishment and internal treatment personnel of the enterprise.

In the absence of special construction scheme and safety technical disclosure by the construction personnel, he organized and implemented the pipe replacement operation of foundation pit excavation, and failed to implement the shutdown order issued by the general contractor He was primarily responsible for the accident.

In the absence of special construction scheme and safety technical disclosure by the construction personnel, he arranged personnel to carry out foundation pit excavation and pipe replacement, failed to implement the shutdown instruction issued by the general contractor, and was mainly responsible for the accident.

Foundation pit (about 4m long, 2.5m wide and 3M deep) after the excavation in place, Shang mouchun and Xu mouyang entered the foundation pit to replace the pipe.

In the morning of June 4, 2021, Cheng arranged Shang Yichun, Xu mouyang and others to Xuehai road At the construction site of well w67-w68 pipeline (West Ring Road East trunk canal), the green belt above the excavated pipeline was cleaned.

After replacing the first section of pipe, they returned to the ground to rest and the excavator cleaned the foundation pit.

Chen, male, aged 59, is the legal representative of the labor service company.

Cai Moujun, male, 46 years old, the subcontractor, the person in charge of the comprehensive treatment project of water environment in the third flood control area of Yancheng City, did not correctly perform his duties, did not organize the preparation of special construction scheme for the company’s foundation pit excavation, did not carry out education and training for operators, and did not carry out safety technical disclosure, Failure to assign full-time safety production management personnel to conduct on-site supervision on the construction operation of dangerous and large projects, and other problems are not managed in place, and they bear the main leadership responsibility for the occurrence of accidents.

In December 2nd, the Yancheng City emergency administration announced a survey report on a foundation pit collapse.

It is suggested that Yancheng Emergency Management Bureau should impose administrative punishment on them..

/ / official account official of WeChat / NOCITCE / WeChat changed the push rule because of the official account of WeChat.

A foundation pit collapse accident occurred during the construction of bid section II of PPP project (including black and odorous water treatment), resulting in one death and a direct economic loss of 2.347 million yuan.

2.

At about 17:00, the foundation pit was closed The south side suddenly collapsed.

Wu moujin, male, 24 years old, on-site coordinator of the subcontractor, failed to correctly perform his work responsibilities.

Seeing that there was no reply, Yang moufei called Wu to enter the site, made the on-site safety production and civilized construction inspection form, and asked him to sign and leave the site.

3.

Wu asked Cheng to stop construction.

Shortly after Wu left the site, the site continued to start construction.

Wang mouzhi, male, 49 years old, the legal representative and general manager of the subcontractor, failed to correctly perform his duties, failed to manage the water environment comprehensive treatment project department in the third flood control area of Yancheng City, failed to supervise the company’s safe production, and took important leadership responsibility for the accident.

At about 16:50, Shang mouchun and Xu mouyang continued to enter the foundation pit to replace the second section of pipe.

It is suggested that Yancheng Emergency Management Bureau should impose administrative punishment on them.