Construction time adjustment of the following two pedestrian overpasses

For some reasons, it will be adjusted to September 26 to September 29 (22:30 at night to 6:00 the next day).

During the construction period, temporary traffic control shall be implemented in this section to prohibit all vehicles from passing…

Cast In Loop

It was originally scheduled to hoist the box girder of the pedestrian overpass on Cuixin Road, Binhe East Road from September 21 to September 23.

For some reasons, it will be adjusted to September 24 to September 26 (22:30 at night to 6:00 the next day).

Motor vehicles, non motor vehicles and pedestrians can bypass Wenxing road and Binhe East Road.

During the construction period, temporary traffic control will be implemented on Binhe West Road (south of Yifen bridge north of Yingze bridge) to prohibit all vehicles from passing.

The bridge deck hoisting construction of pedestrian overpass on the north side of Binhe West Road library was originally scheduled from September 19 to September 21.