The wall grooved buried pipeline must be grooved on the wall and ground before the pipeline can be buried.
Therefore, try to look carefully during acceptance and knock each one.
Facet treatment the so-called “facet” is a small place that the owner can’t see and doesn’t pay much attention to, such as the upper edge of the door, the lower part of the windowsill plate, the inside of the heating hood and so on.
If the wall needs to be repaired after construction, the whole wall shall be painted again.
Before using the emulsion paint, a certain amount of water shall be added, and the prepared emulsion paint shall be used up at one time.
A few workers carry out rough construction during slotting operation, which will not only damage the load-bearing structure of the building, but also damage other nearby pipelines.
Bad businesses are often easy to omit the steps of pasting adhesive tape, which may lead to rough decoration with crooked edges and corners, affecting the beauty..
Many owners of sewer pipes will find that the sewer pipe is blocked in less than a few days in the newly decorated house, and then spend a lot of effort to dredge it.
Wall base treatment for the interior wall decoration of the room, the general emulsion paint needs to be painted more than twice before it is qualified.
Some workers will cut corners and even don’t do any treatment here.
Therefore, it can be said that it is the most important link in the decoration.
We should supervise the electrician to carry out the construction in strict accordance with the operating procedures during the construction.
The paint of the same color should also be painted at one time.
Many friends who lack decoration experience often don’t know what kind of way the decoration team will quietly “dig a pit” during construction.
After the installation of all switches and sockets, we must carry out the actual use to see whether there is heating in these parts.
When laying and pasting bricks, if the on-site construction workers are lazy and perfunctory, there will definitely be many hollows in your wall or floor tiles, and even uneven gaps.
The sense of responsibility of the construction team can be seen from the fineness of joint treatment.
For example, at the junction of the door and the wall, when painting, it is generally necessary to stick adhesive tape on the contact edge between the door and the wall to ensure that the junction is still flat and beautiful after painting.
If workers are not serious or perfunctory during construction, color difference will often occur, especially for latex paint with darker color.
For different wall structures, the requirements for slotting are also different: the load-bearing wall in the house is not allowed to be slotted, and the wall with thermal insulation layer is easy to cause cracking on the surface after slotting, and when slotting on the ground, be careful not to damage the floor and cause trouble to the residents downstairs.
Therefore, when accepting the house, we must use a lot of water to test whether the sewer is unblocked.
This is caused by the decoration master, who is too lazy to dump the site residues and garbage during construction, and uses the sewer as a garbage dump.
Although the design and construction account for half of the pits in the decoration, the construction is the process to truly implement the design effect.
Before construction, confirm the direction and position of the pipeline with the construction team leader again.
If the electrician does not connect the wire according to the construction requirements when installing sockets, switches and lamps, especially when the owner uses some electrical appliances with large power consumption, it is very easy to cause the switches and sockets to heat up or even burn down, resulting in great losses to consumers.