Emergency notice | Ruyang upper stage tunnel construction of ErGuang expressway is prohibited. Pay attention to detour in advance from

October 14, 2021     Source: Henan Expressway public security comprehensive editor: Ruyang City, daily Ruyang statement:.

Vehicles from Nanyang to Luoyang (from south to North) via the upper tunnel: get off at the Ruyang toll station of Erguang Expressway (Erguang k1212), bypass Ru’an road to the toll station of Ruyang industrial zone of Ningluo expressway, enter Ningluo expressway, and enter the north of the common section of Ningluo Expressway and Erguang Expressway to the interchange between Ningluo Expressway and Erguang Expressway (k708 of Ningluo Expressway and k1172 of Erguang Expressway).

Vehicles passing through this section shall pass according to the instructions of road traffic signs and markings.

2.

A diversion point will be set at the main line exit of Ruyang toll station of Erguang Expressway to divert all vehicles from Nanyang Luoyang (from south to North); Normal traffic from Luoyang to Nanyang (from north to South).

to 7:00 a.m.

It is hereby notified.

In order to ensure the traffic safety of expressway, according to the provisions of Article 40 of the road traffic safety law of the people’s Republic of China, traffic restriction measures of half closed construction and half normal traffic will be taken during rush repair construction.

to 7:00 a.m.

on October 20 to 24, Nanyang Luoyang (from south to North) will be closed for construction.

Luoyang Branch of Henan Expressway Development Co., Ltd.

From 21:00 a.m.

Please select the driving route reasonably.

Shuttering Props

The relevant matters are hereby notified as follows:   From October 15 to 24, 2021, the upper tunnel of Erguang Expressway (k1205-k1207) was closed alternately for emergency repair.

on October 15 to 19, Luoyang Nanyang (from north to South) will be closed for construction, and a diversion point will be set at the interchange of Erguang Expressway and Ningluo Expressway to divert all vehicles from Luoyang to Nanyang (from north to South); Normal traffic from Nanyang to Luoyang (from south to North).

Road traffic information can also be obtained through the microblog and wechat platform of Henan Expressway public security and the electronic display screen along the expressway.

During the emergency repair construction, the two-way double tunnel shall pass normally from 7:00 to 21:00 every day.

Vehicles from Luoyang to Nanyang (from north to South) via the upper stage tunnel: get off at the interchange between Erguang Expressway and Ningluo Expressway (k708 of Ningluo Expressway and k1172 of Erguang Expressway) through Ningluo Expressway to the toll station in Ruyang Industrial Zone (k696 of Ningluo Expressway), detour Ru’an road to the upper station of Ruyang toll station of Erguang Expressway and go south.

Notice of the Highway Traffic Police Corps of Henan Provincial Public Security Department on taking traffic restriction measures during the emergency repair of the upper tunnel of Luoyang Ruyang section of Er Guang Expressway some coatings in the double width of the upper tunnel of Luoyang Ruyang section of Er Guang expressway are hollow and cracked due to rainfall and humidity, which has great potential safety hazards.

In case of severe weather conditions, important traffic support tasks, flood control materials and large rescue equipment, the normal road traffic shall be restored.

will carry out emergency repair.

From 21:00 a.m.

Detour route: 1.